EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 15  ELOG logo
ID Date Author Typedown test Category Subject
  242   Sat Mar 11 22:52:48 2023 BSRuns Generalrun_0055

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s

LF =   3.11 MB/s

plunger:

plunger run = 1439

actual distance =  515 um

 

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop: 11.15 pm -> new plunger distance

 

  243   Sat Mar 11 23:30:47 2023 AFRuns Generalrun_0056

run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s

LF =   3.5 MB/s

plunger:

plunger run = 1445

actual distance =  262.7 um

 

micrometer =   266.2 um

position = 30 um

voltage =  3.05 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  246   Sun Mar 12 03:23:05 2023 AFRuns Generalrun_0057

run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s

LF =   3.8 MB/s

plunger:

plunger run = 1484

actual distance =  262.7 um

 

micrometer =   266.9 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started
  248   Sun Mar 12 07:01:31 2023 OSTRuns General 

run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s

LF =   3.79 MB/s

plunger:

plunger run = 1520

actual distance =  262.7 um

 

micrometer =   266.7 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  249   Sun Mar 12 08:03:08 2023 OSTRuns General 

run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s

LF =   3.70 MB/s

plunger:

plunger run = 1530

actual distance =  262.6 um

 

micrometer =   266.8 um

position = 29.9 um

voltage =  3.308 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  252   Sun Mar 12 17:03:12 2023 OSTRuns General 

run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1620

actual distance =  262.5 um

 

micrometer =   266.7 um

position = 29.8 um

voltage =  3.31 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  253   Sun Mar 12 18:50:37 2023 OSTRuns General 

run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s

LF =   3.50 MB/s

plunger:

plunger run = 1638

actual distance =  262.6 um

 

micrometer =   266.9 um

position = 29.8 um

voltage =  3.308 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.

18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.

Run 59 collects radioactivity.

 

-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat

  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity,

Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.

  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 

pure background, g trigger only.

Michal says the"bg" spectrum did not change...
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibration

started

source in the target position, as precisely as possible

 

  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling
  Draft   Mon Mar 23 03:03:54 2026 IPRuns Generalrun 54 - stopped

 

Quote:

run 54 - stopped due to change the distance in plunger

  • Run number: 54
  • Start time: Fri Mar 10 23:14:54 2023
  • Stop time: Sat Mar 11 00:02:37 2023

 

  Draft   Tue Mar 24 09:36:29 2026 mgbRuns General 

 

Quote:

plunger run # 137

 

Beam dump 2.5 enA

Collimator  1.0 enA

02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat

RU : 4.70 MB/s

LF : 7.92 MB/s

Supposed Distance = 10 um

position of the target = 10.7 um

micrometer = 9.8 um

Voltage = 7.89 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

  Draft   Fri Apr 3 20:04:30 2026 IKRuns GeneralRun 48 stopped, run 49 started

 

Quote:

Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat

RU =  10.1 MB/s

LF =   4.68MB/s

plunger:

plunger run = 582

actual distance =  383.1 um

supposed distance = 382.7 um

micrometer =   385.8 um

position =  150.5 um

voltage =  2.145 V

 

Beam dump 0.7 nA

 

 

 

 

 

 

 

  Draft   Sat Apr 4 00:16:43 2026 OSTRuns General 

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s

LF =   3.24 MB/s

plunger:

plunger run = 1060

actual distance =  434.6 um

supposed distance = 435.0 um

micrometer =   435.1 um

position =  201.3 um

voltage =  1.934 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

  Draft   Sat Apr 4 02:37:43 2026 JD, DWRuns General 

run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0005.caendat

RU =  6.49 MB/s

LF =  3.42 MB/s

plunger:

plunger run = 288

actual distance =  282.6um

supposed distance =   282.7um

micrometer =   285.1um

position = 49.9 um

voltage =  2.967V

Beam dump =  0.7-1nA

Collimater=  0.5nA

ELOG V3.0.0-21dc563

  Draft   Tue Apr 7 05:58:24 2026 mgbRuns General 

 

Quote:

 

plunger run # 126

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 2.3 enA

Collimator  1.0 enA

 

RU : 5.44 MB/s

LF : 8.40 MB/s

Supposed Distance = 10 um

position of the target = 10.9 um

micrometer = 10.3 um

Voltage = 7.896 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

  Draft   Tue Apr 7 15:17:01 2026 AMRuns General 

 

Quote:

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0010.caendat

RU =  5.55 MB/s

LF =   3.25 MB/s

 

plunger:

plunger run = 1002

actual distance =  434.3 um

supposed distance = 435.0 um

micrometer =   435.6 um

position =  201.6 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

 

 

ELOG V3.1.5-fc6679b