EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 14  ELOG logo
ID Date Author Typedown test Category Subject
  242   Sat Mar 11 22:52:48 2023 BSRuns Generalrun_0055

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s

LF =   3.11 MB/s

plunger:

plunger run = 1439

actual distance =  515 um

 

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop: 11.15 pm -> new plunger distance

 

  243   Sat Mar 11 23:30:47 2023 AFRuns Generalrun_0056

run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s

LF =   3.5 MB/s

plunger:

plunger run = 1445

actual distance =  262.7 um

 

micrometer =   266.2 um

position = 30 um

voltage =  3.05 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  246   Sun Mar 12 03:23:05 2023 AFRuns Generalrun_0057

run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s

LF =   3.8 MB/s

plunger:

plunger run = 1484

actual distance =  262.7 um

 

micrometer =   266.9 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started
  248   Sun Mar 12 07:01:31 2023 OSTRuns General 

run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s

LF =   3.79 MB/s

plunger:

plunger run = 1520

actual distance =  262.7 um

 

micrometer =   266.7 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  249   Sun Mar 12 08:03:08 2023 OSTRuns General 

run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s

LF =   3.70 MB/s

plunger:

plunger run = 1530

actual distance =  262.6 um

 

micrometer =   266.8 um

position = 29.9 um

voltage =  3.308 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  252   Sun Mar 12 17:03:12 2023 OSTRuns General 

run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1620

actual distance =  262.5 um

 

micrometer =   266.7 um

position = 29.8 um

voltage =  3.31 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  253   Sun Mar 12 18:50:37 2023 OSTRuns General 

run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s

LF =   3.50 MB/s

plunger:

plunger run = 1638

actual distance =  262.6 um

 

micrometer =   266.9 um

position = 29.8 um

voltage =  3.308 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.

18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.

Run 59 collects radioactivity.

 

-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat

  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity,

Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.

  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 

pure background, g trigger only.

Michal says the"bg" spectrum did not change...
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibration

started

source in the target position, as precisely as possible

 

  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling
  21   Thu Mar 2 09:05:43 2023 DODProblems  Sulphur on aluminium fusion-evaporation reactions

Using  the data which we've sorted to date, I looked into the gamma-gamma coincidences and have identified a number of nuclei e.g. 50Cr, 52Mn, 55Fe which would be consistent with fusion-evaporation reactions involving the sulphur-32 projectiles and aluminium-27. Such reactions would yield a 59Cu comound system and these channels would be populated as a result of the evaporation of a combination of alphas, protons and neutrons.

These lines are intense and the conicdences are very clear and clean. I think this suggests that the beam is hitting some aluminium components within the plunger chamber. This could be the plunger vessel itself or the target frame perhaps.

There is another interesting observation: some of the identified transitions are emitted from levels which have sub-ps lifetimes. At this plunger distance, we might expect these lines to be fully Doppler shifted as they would decay in-flight well in advance of reaching the stopper. Yet, we observe these lines with their non-Doppler shifted energies suggesting that they are not being emitted in-flight but rather at rest. This might suggest that the 32S+27Al reactions are taking place within some thick piece of aluminium. Some of the lines show signs of having been shifted in energy to some extent which might indicate that not all of the ions are completely stopped. The observed lineshapes seem to be consistent with the short-lived states showing evidence of Doppler shift while the decay of the "longer-lived" states (~9 ps) are very sharp.

I haven't slept for about 24 hours so I may be talking absolute sh*te (famous Scottish word).

  43   Fri Mar 3 02:23:45 2023 GJProblems Softwarebuilder gate, TS offsets
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
It seems way too large to me.
We are summing up the events and then, not surprisingly, having rubbish gamma-gamma matrices.
The gate is 1500 ns, while Ge are not so far away from each other.

Any fixed time differences should be corrected with LF configuration.
Having all Ge, ACS, and Neda TS-aligned at LF level, BU will do a good job with a reasonable short gate.

We need channel-by-channel TS differences.

The data we took and we are taking now can be recovered in terms of this correction later on.

Marcin can build the events correctly from LF level.
Let's try to do so with as short gates as possible and see again the gamma-gamma matrix and neutron-gated g-g 
matrix.
Attachment 1: run_0035_BU_lenghts.png
run_0035_BU_lenghts.png
  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

Attachment 1: 333626140_152534624340296_7230383118242592907_n.jpg
333626140_152534624340296_7230383118242592907_n.jpg
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junk

Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed

Attempts to load topology failed.

Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)

Grzes is trying to fix the problem remotely, while we are starting changing of the target....

 

 

  100   Mon Mar 6 05:15:43 2023 JD, DWProblems BeamNo beam 05:10:00

No beam 05:10:00

  107   Mon Mar 6 09:53:06 2023 OSTProblems BeamBeam dump decreased 2.5 nA to 1.5 nA- stopped run 41

9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA

  113   Mon Mar 6 17:19:24 2023 OSTProblems Beambeam unstable and a little high

16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s

17:10 beam fixed. stable