EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 15  ELOG logo
ID Date Authordown Type test Category Subject Text Attachments
  216   Fri Mar 10 21:15:01 2023 IPRuns General run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat
  
  217   Fri Mar 10 21:24:29 2023 IPRuns Beamthe beam stoppedthe beam is stopped at 21:23.   
  218   Fri Mar 10 21:26:55 2023 IPProblems Beamproblem with focus the beamthe beam is not the best focused. The operator
works on this problem.
  
  219   Fri Mar 10 21:29:28 2023 IPRuns Beambeam startthe beam starts at 21:27.

But the operators are still working
on focusing the beam.
  
  220   Fri Mar 10 21:30:42 2023 IPProblem Fixed Beamthe beam is focusedthe beam is now good focused   
  221   Fri Mar 10 22:36:55 2023 IPRuns General run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat
  
  222   Fri Mar 10 22:40:00 2023 IPOther GeneralGe - the rate is higherthe rates of detectors are still a bit
higher

 Screenshot_2023-03-10_22-37-27.png 
  223   Fri Mar 10 23:27:51 2023 IPProblems Softwarerun 53 - stoppedthe daq crashed at 22:43 -- problem with
Local Filter

the run 53 - stopped
  
  224   Fri Mar 10 23:29:43 2023 IPProblem Fixed Softwarenew run 54the daq resolved at 23:15

start new run: run 54
  
  225   Fri Mar 10 23:35:28 2023 IPRuns General run control = 54

 

run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat
  
  226   Sat Mar 11 00:05:06 2023 IPRuns Generalrun 54 - stoppedrun 54 - stopped due to change the distance
in plunger


Run number: 54
Start
  
  Draft   Mon Mar 23 03:03:54 2026 IPRuns Generalrun 54 - stopped 




  
  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectraGe rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2.
 ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png 
  159   Wed Mar 8 10:27:26 2023 IK, BSOther GeneralGe spectraCount rates are still a bit high (~2.6kHz
for EAGLE det4). Ge spectra looks fine compared
to earlier ones.
 Screenshot_2023-03-08_10-24-20.png 
  166   Wed Mar 8 15:57:53 2023 IK, AMProblems GeneralBeam issueno beam in 15:52 - 16:21 due to power supply
problem
  
  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 startedRun 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
  
  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solvedCurrent readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding
  
  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.Issue described in #61 continues to
persist.

Beam stopped from 19:20 to 19:32,
 333626140_152534624340296_7230383118242592907_n.jpg 
  Draft   Mon Mar 6 19:08:51 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat

RU = 6.95 MB/s
  
  116   Mon Mar 6 20:29:45 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat

RU = 6.75 MB/s
  
ELOG V3.1.5-fc6679b