EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 15  ELOG logo
ID Date Authordown Type test Category Subject Text Attachments
  117   Mon Mar 6 22:30:46 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat

RU = 6.64 MB/s
  
  157   Wed Mar 8 07:57:05 2023 IKProblems Beambeam unstableThe beam was unstable from 7:55. Stabilized
around 8:03.

Counting rates are higher, EAGLE
 Screenshot_2023-03-08_08-17-41.png 
  158   Wed Mar 8 09:31:43 2023 IKRuns GeneralRun 48 stopped, run 49 startedRun 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
  
  160   Wed Mar 8 10:31:10 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
  
  161   Wed Mar 8 11:42:14 2023 IKProblems GeneralRun 49Counting rates continued to increase (det4
> 3kHz). Beam current looked fine on the
beam dump, but beam is fluctuating, and can
 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png 
  162   Wed Mar 8 12:11:59 2023 IKProblem Fixed Generalbeam tunedBeam tuning was made, focusing significantly
improved.

 
  
  163   Wed Mar 8 13:02:38 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
  
  164   Wed Mar 8 13:04:05 2023 IKRuns GeneralGe spectraGe spectra after #161 - #162 beam tuning.  Screenshot_2023-03-08_13-03-10.png 
  Draft   Fri Apr 3 20:04:30 2026 IKRuns GeneralRun 48 stopped, run 49 started 




  
  245   Sun Mar 12 03:05:45 2023 GJ, AFProblems Networkno data flux visible in grafena, LF prints "write: Broken pipe"As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
  
  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal   HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf 
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participantsTo be filled in, with affiliation and email.

Presumably, for later publication
purposes.
  
  3   Mon Feb 27 02:49:10 2023 GJRuns Generalcalibs - 2x 152Eu - run 0Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
  
  39   Thu Mar 2 23:04:01 2023 GJProblem Fixed HardwareConnection of the plunger cables, grounding, beam read-out for the operatorsNotes of the measurements with different conditions
are attached.
 Slp823030222550.pdf 
  43   Fri Mar 3 02:23:45 2023 GJProblems Softwarebuilder gate, TS offsetsData from current run - 35, with limited beam
current and rates - see a recent post by
Güray.
 run_0035_BU_lenghts.png 
  175   Thu Mar 9 01:41:50 2023 GJProblem Fixed HardwareTS zeroing - cables to S-IN from VME controller - between runs 49 and 50Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the 
  
  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained. 
  
  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling    
  228   Sat Mar 11 09:29:48 2023 EGOther  current exeriment parameters as requested in the manual for shifters41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok
  
  229   Sat Mar 11 10:46:37 2023 EGOtherBeam intensity  ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz.
  
ELOG V3.1.5-fc6679b