| ID |
Date |
Author |
Type |
test |
Category |
Subject |
Text |
 |
|
117
|
Mon Mar 6 22:30:46 2023 |
IK | Runs | | General | | RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat
RU = 6.64 MB/s |
|
|
157
|
Wed Mar 8 07:57:05 2023 |
IK | Problems | | Beam | beam unstable | The beam was unstable from 7:55. Stabilized
around 8:03.
Counting rates are higher, EAGLE |
|
|
158
|
Wed Mar 8 09:31:43 2023 |
IK | Runs | | General | Run 48 stopped, run 49 started | Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
|
|
|
160
|
Wed Mar 8 10:31:10 2023 |
IK | Runs | | General | Run 49 | run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat
RU = 10.6 MB/s |
|
|
161
|
Wed Mar 8 11:42:14 2023 |
IK | Problems | | General | Run 49 | Counting rates continued to increase (det4
> 3kHz). Beam current looked fine on the
beam dump, but beam is fluctuating, and can |
  |
|
162
|
Wed Mar 8 12:11:59 2023 |
IK | Problem Fixed | | General | beam tuned | Beam tuning was made, focusing significantly
improved.
|
|
|
163
|
Wed Mar 8 13:02:38 2023 |
IK | Runs | | General | Run 49 | run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat
RU = 7.86 MB/s |
|
|
164
|
Wed Mar 8 13:04:05 2023 |
IK | Runs | | General | Ge spectra | Ge spectra after #161 - #162 beam tuning. |
|
|
Draft
|
Fri Apr 3 20:04:30 2026 |
IK | Runs | | General | Run 48 stopped, run 49 started |
|
|
|
245
|
Sun Mar 12 03:05:45 2023 |
GJ, AF | Problems | | Network | no data flux visible in grafena, LF prints "write: Broken pipe" | As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible |
|
|
1
|
Sun Feb 26 16:50:56 2023 |
GJ | Other | | General | proposal | |
|
|
2
|
Sun Feb 26 17:26:45 2023 |
GJ | Other | | General | List of participants | To be filled in, with affiliation and email.
Presumably, for later publication
purposes. |
|
|
3
|
Mon Feb 27 02:49:10 2023 |
GJ | Runs | | General | calibs - 2x 152Eu - run 0 | Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
|
|
|
39
|
Thu Mar 2 23:04:01 2023 |
GJ | Problem Fixed | | Hardware | Connection of the plunger cables, grounding, beam read-out for the operators | Notes of the measurements with different conditions
are attached.
|
|
|
43
|
Fri Mar 3 02:23:45 2023 |
GJ | Problems | | Software | builder gate, TS offsets | Data from current run - 35, with limited beam
current and rates - see a recent post by
Güray.
|
|
|
175
|
Thu Mar 9 01:41:50 2023 |
GJ | Problem Fixed | | Hardware | TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 | Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the
|
|
|
256
|
Sun Mar 12 20:31:45 2023 |
GJ | Runs | | General | run_61 - target and stopper and beam dump dismounted. | target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained.
|
|
|
258
|
Sun Mar 12 21:33:54 2023 |
GJ | Runs | | General | run 63 - 152 Eu during LN2 filling | |
|
|
228
|
Sat Mar 11 09:29:48 2023 |
EG | Other | | | current exeriment parameters as requested in the manual for shifters | 41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok |
|
|
229
|
Sat Mar 11 10:46:37 2023 |
EG | Other | Beam intensity | | | ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz. |
|