EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 12 of 15
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
282 Entries
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
,
14
,
15
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
230
Sat Mar 11 11:39:55 2023
EG
Problems
Buffers clearing
at 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly?
231
Sat Mar 11 12:42:42 2023
EG
Other
Beam intensity reduction
Again beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4.
Beam intensity reduction requested. 1.8 kHz
232
Sat Mar 11 14:15:55 2023
EG
Runs
Beam intensity rapid increase
14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes.
233
Sat Mar 11 14:42:28 2023
EG
Runs
Beam instabilities
Large beam intensity instabilities from
14:10 till 14:40. Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned
234
Sat Mar 11 15:16:31 2023
EG
Other
Beam intensity reduced again
Again beam intensity to high. Reduced to
2 kHz on ch4 GE
250
Sun Mar 12 09:15:00 2023
EG
Other
Array_monitors mat refresh synchronization
Beam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but....
251
Sun Mar 12 13:20:00 2023
EG
Problems
No Data
For a split second a red "NO DATA"
notification appeared in the top right corner
of Counting rates dashboard.
Draft
Thu Apr 16 05:09:13 2026
EG
Runs
Beam intensity rapid increase
18
Thu Mar 2 04:17:40 2023
DOD
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
21
Thu Mar 2 09:05:43 2023
DOD
Problems
Sulphur on aluminium fusion-evaporation reactions
Using the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
259
Sun Mar 12 22:52:36 2023
Bahadir Saygi
Other
General
Plunger Run Files
Plunger run files for later to calculate
error in the distance
93
Mon Mar 6 00:43:27 2023
BS, GJ
Runs
General
Run 40 Started
Before this run TSs were moved on the LF
level, so the BU has easier job to do and
everything is more stable.
15
Wed Mar 1 20:10:38 2023
BS, DOD
Other
General
Run 26 is going on but not much for the
moment in terms of any useful data.
And half of the EAGLE is opened.
17
Thu Mar 2 00:30:29 2023
BS, DOD
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
4
Mon Feb 27 12:10:24 2023
BS
Other
Target
target
Support of Target = 1.5 mg/cm2 Ta
Target = 1.0 mg/cm2 Cd-106
Stopper = 10 mg/cm2 Au
7
Tue Feb 28 23:08:35 2023
BS
Other
SHIFT LIST
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing
8
Tue Feb 28 23:10:36 2023
BS
Other
What we need to include for Plunger
Plunger Run :
Micrometer :
Supposed Distance:
12
Wed Mar 1 16:06:50 2023
BS
Runs
Run 23 Stopped
Run 23 Stopped due to some unexpected spikes
in the
voltage of collimator.
13
Wed Mar 1 16:07:49 2023
BS
Runs
Run 24 Started
Run 24 has been started but no beams at
the moment.
EAGLE is opened.
14
Wed Mar 1 19:04:37 2023
BS
Runs
Run
General
Run 26 Started
Run 26 Started
Beam 9 enA on the collimator
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
,
14
,
15
Next
All
ELOG V3.1.5-fc6679b