EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 13 of 14
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
,
2
,
3
...
12
, 13,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
24
Thu Mar 2 09:49:13 2023
BS
Runs
General
run 28 started
run 28 started
23
Thu Mar 2 09:24:47 2023
ost-mgb
Runs
Run 27 stopped
General
Run 27 stopped
22
Thu Mar 2 09:20:17 2023
ost-mgb
Runs
General
Rates
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
21
Thu Mar 2 09:05:43 2023
DOD
Problems
Sulphur on aluminium fusion-evaporation reactions
Using the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
20
Thu Mar 2 07:40:55 2023
ost-dod
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
19
Thu Mar 2 05:33:34 2023
ost-dod
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
18
Thu Mar 2 04:17:40 2023
DOD
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
17
Thu Mar 2 00:30:29 2023
BS, DOD
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
16
Wed Mar 1 21:59:45 2023
MB BS
Other
General
Offset of the plunger is 60 um.
new distcal01_vac_after_opening
15
Wed Mar 1 20:10:38 2023
BS, DOD
Other
General
Run 26 is going on but not much for the
moment in terms of any useful data.
And half of the EAGLE is opened.
14
Wed Mar 1 19:04:37 2023
BS
Runs
Run
General
Run 26 Started
Run 26 Started
Beam 9 enA on the collimator
13
Wed Mar 1 16:07:49 2023
BS
Runs
Run 24 Started
Run 24 has been started but no beams at
the moment.
EAGLE is opened.
12
Wed Mar 1 16:06:50 2023
BS
Runs
Run 23 Stopped
Run 23 Stopped due to some unexpected spikes
in the
voltage of collimator.
11
Wed Mar 1 12:51:33 2023
MP
Runs
Beam
beam on the target
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA)
10
Wed Mar 1 11:52:48 2023
MP
Runs
first beam
Operators tune beam on the target, collecting
run 0023, trigger gg.
9
Wed Mar 1 00:14:28 2023
MP
Other
Beam
beam energy
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
8
Tue Feb 28 23:10:36 2023
BS
Other
What we need to include for Plunger
Plunger Run :
Micrometer :
Supposed Distance:
7
Tue Feb 28 23:08:35 2023
BS
Other
SHIFT LIST
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing
6
Mon Feb 27 12:21:29 2023
MP, BS
Runs
General
List of runs
A list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
5
Mon Feb 27 12:13:03 2023
MB
Other
Plunger Informations
Off set of the plunger ~60 um
Distcal file distcal01_vac
Goto page
Previous
1
,
2
,
3
...
12
, 13,
14
Next
All
ELOG V3.1.5-fc6679b