  HIL099-134Sm, Page 1 of 14  ELOG logo
ID Date Author Typedown test Category Subject Text Attachments
  3   Mon Feb 27 02:49:10 2023 GJRuns Generalcalibs - 2x 152Eu - run 0Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
  
  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runsA list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  
  10   Wed Mar 1 11:52:48 2023 MPRuns  first beamOperators tune beam on the target, collecting
run 0023, trigger gg.
  
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  12   Wed Mar 1 16:06:50 2023 BSRuns  Run 23 StoppedRun 23 Stopped due to some unexpected spikes
in the

voltage of collimator.
  
  13   Wed Mar 1 16:07:49 2023 BSRuns  Run 24 StartedRun 24 has been started but no beams at
the moment.

EAGLE is opened.
  
  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 StartedRun 26 Started

 

Beam 9 enA on the collimator
  
  17   Thu Mar 2 00:30:29 2023 BS, DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  18   Thu Mar 2 04:17:40 2023 DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  19   Thu Mar 2 05:33:34 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  20   Thu Mar 2 07:40:55 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRatesRun 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  23   Thu Mar 2 09:24:47 2023 ost-mgbRunsRun 27 stoppedGeneral Run 27 stopped   
  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 startedrun 28 started   
  25   Thu Mar 2 10:18:14 2023 ost-mgbRuns Generalrun 29 startedRun 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  26   Thu Mar 2 11:14:44 2023 ost-mgbRuns General un 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stoppedWe will change the trigger and we stopped
the run number 29
  
  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 StartsWe hane now g-g trigger started.

Run 30 started
  
  29   Thu Mar 2 12:09:44 2023 ost-mgbRuns General beam stop,   
  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 ContinueedEAGLE is closed now

We gave a break to test the cable
connection of target, degrader, beam dump
  