| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
31
|
Thu Mar 2 14:59:32 2023 |
mgb | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s |
|
32
|
Thu Mar 2 15:15:40 2023 |
mgb | Runs | | General | beam stopped. eagle is opened and run 30 continues |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
beam off and on and off. eagle is opened and run 30 continues
new cable is stucked
Cable test is going on |
|
33
|
Thu Mar 2 16:06:17 2023 |
A.T. | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
cables to colimeter are checked and replaced. |
|
34
|
Thu Mar 2 16:40:45 2023 |
MP | Runs | | General | changing the plunger distance to minimum. |
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
|
35
|
Thu Mar 2 17:23:53 2023 |
BS | Runs | | General | Plunger Informations |
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
|
|
36
|
Thu Mar 2 17:25:36 2023 |
BS | Runs | | General | Run 32 Stopped |
Run 32 Stopped |
|
37
|
Thu Mar 2 17:28:21 2023 |
BS | Runs | | | Run 33 Started |
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
20:50 Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam.
run stop 22:53 acquisition problem |
|
38
|
Thu Mar 2 23:01:21 2023 |
A.T. | Runs | | General | Run 34 started |
Run 34 Started (33 was stopped due to acquisition problems)
Plunger Run : 105
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 12.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
at the first 10 min det # 5 was switched off
Ge det # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
old scalers: 5 2.5 8 5 8.5 3 5 1.5 5 8.5 8.5 7.5 2.7 2.7 5 kHz
new (Grzes) 1.7 1 3.2 1.8 3.6 0.9 1.7 0.45 1.7 3.5 3.2 3.1 1. 1. 1.7 kHz
beam dump current 3nA
det # 5 scaler 7.7 kHz
stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run) |
|
40
|
Fri Mar 3 00:09:19 2023 |
MP, AT | Runs | | | run 35 |
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 1.8 enA
Collimator 0.8 enA
The operator is asked to keep the beam dump current not larger than the present value.
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 11.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
Observed that detectors at theta 143 degrees count most. Is this because they see beam dump? |
|
41
|
Fri Mar 3 01:15:27 2023 |
mgb | Runs | | General | |
plunger run # 126
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 2.3 enA
Collimator 1.0 enA
RU : 5.44 MB/s
LF : 8.40 MB/s
Supposed Distance = 10 um
position of the target = 10.9 um
micrometer = 10.3 um
Voltage = 7.896 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
42
|
Fri Mar 3 02:20:46 2023 |
mgb | Runs | | General | |
plunger run # 137
Beam dump 2.5 enA
Collimator 1.0 enA
02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat
RU : 4.70 MB/s
LF : 7.92 MB/s
Supposed Distance = 10 um
position of the target = 10.7 um
micrometer = 9.8 um
Voltage = 7.89 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
44
|
Fri Mar 3 03:19:34 2023 |
mgb | Runs | | General | |
plunger run # 147
Beam dump 2.5 enA
Collimator 0.9 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat
RU : 4.90 MB/s
LF : 8.07 MB/s
Supposed Distance = 10 um
position of the target = 10.5 um
micrometer = 9.2 um
Voltage = 7.93 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
45
|
Fri Mar 3 04:15:32 2023 |
mgb | Runs | | General | |
plunger run # 157
Beam dump 2.5 enA
Collimator 1.0 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat
RU : 4.79 MB/s
LF : 7.69 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 8.9 um
Voltage = 7.94 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
46
|
Fri Mar 3 05:18:35 2023 |
OST | Runs | | General | |
plunger run # 167
Beam dump 2.5 enA
Collimator 1.0 enA
Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0022.caendat
RU : 4.90 MB/s
LF : 8.01 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 8.8 um
Voltage = 7.941 V
nothing has changed. the situation is stable. |
|
47
|
Fri Mar 3 06:24:03 2023 |
OST | Runs | | General | |
plunger run # 178
Beam dump 2.5 enA
Collimator 0.9 enA
Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0027.caendat
RU : 4.65 MB/s
LF : 7.52 MB/s
Supposed Distance = 10 um
position of the target = 10.1 um
micrometer = 8.7 um
Voltage = 7.97 V
nothing has changed. the situation is stable. |
|
48
|
Fri Mar 3 07:32:28 2023 |
OST | Runs | | General | |
plunger run # 188
Beam dump 2.5 enA
Collimator 0.8 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0030.caendat
RU : 4.15 MB/s
LF : 7.69 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 9 um
Voltage = 8.964 V
Readout data decreased 5 mb/s to 4 mb/s during 6:30 to 7:30 am. slowly returning to normal value
|
|
49
|
Fri Mar 3 08:20:13 2023 |
KWL | Runs | | General | |
plunger run # 196
Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA
Collimator 0.75 enA
Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0033.caendat
RU : 4.10 MB/s
LF : 7.48 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 9 um
Voltage = 7.94 V |
|
50
|
Fri Mar 3 09:30:15 2023 |
IP. KWL | Runs | | General | |
plunger run # 208
Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA
Collimator 0.75 enA
Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat
RU : 3.85 MB/s
LF : 7,29 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 9.3 um
Voltage = 7.93 V |
|
51
|
Fri Mar 3 10:09:20 2023 |
IP. KWL | Runs | | General | beam intensity decreased to 0.3 enA (at beam dump) on our request |
// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ).
Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)
plunger run # 216
Beam dump 0.3 enA (given by operators) * 7 (following entry ID#39) = 2.1 enA
Collimator enA
Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0040.caendat
RU : 2.15 MB/s
LF : 5.60 MB/s
Supposed Distance = 10 um
position of the target = 10.6 um
micrometer = 8.8 um
Voltage = 7.8 V |
|
52
|
Fri Mar 3 10:21:18 2023 |
IP. KWL | Runs | | General | beam intensity back to 1.25 enA at the beam dump |
we increased beam intensity to 1.25 enA (readout at the beam dump) |