EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 3 of 14  ELOG logo
ID Date Author Typedown test Category Subject
  53   Fri Mar 3 11:37:25 2023 IPRuns General 

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

  54   Fri Mar 3 11:48:29 2023 IPRuns Generalbeam stopped

The beam is gone.

  55   Fri Mar 3 12:11:24 2023 IPRuns General 

the beam comes back.

  56   Fri Mar 3 13:43:56 2023 IP. KWLRuns  511 annihilation and 279 Au lines in Ge rings

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

Attachment 1: ge_rings101_117_143_acceptedACS_gold_line_279keV.png
ge_rings101_117_143_acceptedACS_gold_line_279keV.png
Attachment 2: ge_rings101_117_143_acceptedACS.png
ge_rings101_117_143_acceptedACS.png
  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurement

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

  58   Fri Mar 3 14:22:12 2023 IPRuns General 

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 started

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

  64   Fri Mar 3 23:38:28 2023 SPRuns GeneralHow different Ge count

All germanium detecors look reasonable, as attached.

Attachment 1: ge_en_cal_230303_2337.png
ge_en_cal_230303_2337.png
  65   Sat Mar 4 08:27:23 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57

LF = 3.11

Plunger ;

Planger run = 437

Supposed Dist=10

Micrometer = 10.1

Position = 10.4

Voltage = 7.923

Beam dumb = 0.75 nA

Collimeter =0.5 nA

Everythings is looking stable.

  66   Sat Mar 4 09:51:32 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43

LF = 3.45

Plunger ;

Planger run = 452

Supposed Dist=10

Micrometer = 10.4

Position = 10.4

Voltage = 7.926

Beam dumb = 1 nA

Collimeter =0.5 nA

Everythings is looking stable.

  67   Sat Mar 4 11:06:31 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03

LF = 3.36

Plunger ;

Planger run = 465

Supposed Dist=10

Micrometer = 10.5

Position = 10.5

Voltage = 7.91

Beam dumb = 0.75 nA

Collimeter =0.6 nA

Everythings is looking stable.

  68   Sat Mar 4 12:34:52 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17

LF = 3.25

Plunger ;

Planger run = 479

Supposed Dist=10

Micrometer = 10.6

Position = 10.5

Voltage = 7.908

Beam dumb = 0.8 nA

Collimeter =0.7 nA

Everythings continues to stable.

  69   Sat Mar 4 13:43:20 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30

LF = 3.70

Plunger ;

Planger run = 491

Supposed Dist=10

Micrometer = 10.9

Position = 10.4

Voltage = 7.924

Beam dumb = 1 nA

Collimeter =0.7 nA

Everythings continues to stable.

  70   Sat Mar 4 15:02:54 2023 mgbRuns Generalrunning stable

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99

LF = 3.35

Plunger ;

Planger run = 504

Supposed Dist=10

Micrometer = 11.1

Position = 10.2

Voltage = 8.964

Beam dumb = 1 nA

Collimeter =0.7 nA

  71   Sat Mar 4 16:06:19 2023 mgbRuns General 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat

RU = 6.25

LF = 3.39

Plunger ;

Planger run = 515

Supposed Dist=10 um

Actual Distance = 9.7 um

Position = 10.3 um

Voltage = 7.938 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  72   Sat Mar 4 17:09:13 2023 mgbRuns General 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat

RU = 6.45 MB/s

LF = 3.45 MB/s

Plunger ;

Planger run = 525

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.2 um

Position = 10.1 um

Voltage = 7.943 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  73   Sat Mar 4 18:02:48 2023 mgbRuns General 

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat

RU = 6.39 MB/s

LF = 3.42 MB/s

Plunger ;

Planger run = 534

Supposed Dist=10 um

Actual Distance = 9.9 um

micrometer = 11.4 um

Position = 10.3 um

Voltage = 7.933 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  74   Sat Mar 4 19:14:30 2023 AFRuns General 

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0144.caendat

RU = 6.46 MB/s

LF = 3.48 MB/s

Plunger ;

Planger run = 546

Supposed Dist=10 um

Actual Distance = 10 um

micrometer = 11.4 um

Position = 10.4 um

Voltage = 7.923 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  75   Sat Mar 4 20:56:40 2023 AFRuns General 

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 563

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.0 um

Position = 10.1 um

Voltage = 7.947 V

Beam dumb =

Collimeter =

 

Stopped at 10.51 pm

Plan: change the distance between the target and the stopper

Plunger run nr at stop: 582

beam current at stop: 0.9 enA at the beam dump

 

  76   Sat Mar 4 23:28:16 2023 AFRuns General 

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0000.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 585

Supposed Dist=240 um

Actual Distance = 240 (+60) um

Position = 240.9 um

Voltage = 2.717 V

Beam dumb = 0.75 - 1.0 enA

Collimeter = 0.75-1.0 enA

 

ELOG V3.1.5-fc6679b