EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Stop time: Mon Feb 27 03:21:01 2023

Two Eu sources hanging in more or less focus points of two partially open halves of EAGLE.
Entry  Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs 
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
Entry  Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam 
Operators tune beam on the target, collecting run 0023, trigger gg.
Entry  Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target 
Beam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)    not stable
5 mm collimator:  0.8 enA 

data taking continued with run 0023
Entry  Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped 

Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.

The chamber was opened and observed some yellow spots

seen over the Cd target.

Entry  Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started 

Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.

Entry  Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started 

Run 26 Started

 

Beam 9 enA on the collimator

Entry  Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0011.caendat

 

RU = 5.58 Mb/s

LF = 3.72 Mb/s

Entry  Thu Mar 2 04:17:40 2023, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0027.caendat

 

RU = 5.10 Mb/s

LF = 3.75 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat

 

RU = 4.70 Mb/s

LF = 3.20 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat

 

RU = 4.48 Mb/s

LF = 4.07 Mb/s

Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat

 

RU = 6.25 Mb/s

LF = 4.06 Mb/s

09:15 beam stopped. data saved

Entry  Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,  

Run 27 stopped

Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 

run 28 started

Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 

Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat

 

RU = 38.5 Mb/s

LF = 12.0 Mb/s

 

Entry  Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,  

un 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat

 

RU = 40.1 Mb/s

LF = 12.5 Mb/s

Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 

We will change the trigger and we stopped the run number 29

Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 

We hane now g-g trigger started.

Run 30 started

Entry  Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,  

beam stop,

Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

ELOG V3.1.5-fc6679b