EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
ID Date Author Typedown test Category Subject
  31   Thu Mar 2 14:59:32 2023 mgbRuns General 

 

 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

  32   Thu Mar 2 15:15:40 2023 mgbRuns Generalbeam stopped. eagle is opened and run 30 continues

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

beam off and on and off. eagle is opened and run 30 continues

new cable is stucked

Cable test is going on

  33   Thu Mar 2 16:06:17 2023 A.T.Runs General 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger Informations

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
 

  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 Stopped

Run 32 Stopped

  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 Started

Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

20:50   Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam. 

run stop 22:53 acquisition problem

  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 started

Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 12.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

at the first 10 min det # 5 was switched off

Ge det #            1         2        3          4         5        6          7          8          9           10           11          12           13         14         15

old scalers:         5        2.5      8          5         8.5     3          5         1.5        5           8.5          8.5          7.5         2.7        2.7         5      kHz

new (Grzes)        1.7     1         3.2       1.8      3.6     0.9       1.7       0.45    1.7          3.5         3.2          3.1         1.           1.          1.7    kHz

 

beam dump current 3nA

det # 5 scaler  7.7   kHz

stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run)

  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35

Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 1.8 enA

Collimator  0.8 enA

The operator is asked to keep the beam dump current not larger than the present value.

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 11.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

Observed that detectors at theta 143 degrees count most.  Is this because they see beam dump?

  41   Fri Mar 3 01:15:27 2023 mgbRuns General 

 

plunger run # 126

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 2.3 enA

Collimator  1.0 enA

 

RU : 5.44 MB/s

LF : 8.40 MB/s

Supposed Distance = 10 um

position of the target = 10.9 um

micrometer = 10.3 um

Voltage = 7.896 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  42   Fri Mar 3 02:20:46 2023 mgbRuns General 

plunger run # 137

 

Beam dump 2.5 enA

Collimator  1.0 enA

02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat

RU : 4.70 MB/s

LF : 7.92 MB/s

Supposed Distance = 10 um

position of the target = 10.7 um

micrometer = 9.8 um

Voltage = 7.89 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  44   Fri Mar 3 03:19:34 2023 mgbRuns General 

plunger run # 147

 

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat

RU : 4.90 MB/s

LF : 8.07 MB/s

Supposed Distance = 10 um

position of the target = 10.5 um

micrometer = 9.2 um

Voltage = 7.93 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  45   Fri Mar 3 04:15:32 2023 mgbRuns General 

plunger run # 157

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat

RU : 4.79 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.9 um

Voltage = 7.94 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  46   Fri Mar 3 05:18:35 2023 OSTRuns General 

plunger run # 167

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0022.caendat

RU : 4.90 MB/s

LF : 8.01 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.941 V

nothing has changed. the situation is stable.

  47   Fri Mar 3 06:24:03 2023 OSTRuns General 

plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0027.caendat

RU : 4.65 MB/s

LF : 7.52 MB/s

Supposed Distance = 10 um

position of the target = 10.1 um

micrometer = 8.7 um

Voltage = 7.97 V

nothing has changed. the situation is stable.

  48   Fri Mar 3 07:32:28 2023 OSTRuns General 

plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0030.caendat

RU : 4.15 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 8.964 V

Readout data decreased 5 mb/s to 4 mb/s during 6:30 to 7:30 am. slowly returning to normal value

 

  49   Fri Mar 3 08:20:13 2023 KWLRuns General 

plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0033.caendat

RU : 4.10 MB/s

LF : 7.48 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 7.94 V

  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General 

plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat

RU : 3.85 MB/s

LF : 7,29 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9.3 um

Voltage = 7.93 V

  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request

// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)

 

plunger run # 216

Beam dump 0.3 enA (given by operators) * 7 (following entry ID#39) = 2.1 enA

Collimator     enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0040.caendat

RU : 2.15 MB/s

LF : 5.60 MB/s

Supposed Distance = 10 um

position of the target = 10.6 um

micrometer = 8.8 um

Voltage = 7.8 V

Attachment 1: Ge_beamInten_03enA_differentYscale.png
Ge_beamInten_03enA_differentYscale.png
Attachment 2: Ge_beamInten_03enA_sameYscale.png
Ge_beamInten_03enA_sameYscale.png
  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dump

we increased beam intensity to 1.25 enA (readout at the beam dump)

ELOG V3.1.5-fc6679b