EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 3 of 14  ELOG logo
Entry  Fri Mar 3 11:37:25 2023, IP, Runs, , General,  

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

Entry  Fri Mar 3 11:48:29 2023, IP, Runs, , General, beam stopped 

The beam is gone.

Entry  Fri Mar 3 12:11:24 2023, IP, Runs, , General,  

the beam comes back.

Entry  Fri Mar 3 13:43:56 2023, IP. KWL, Runs, , , 511 annihilation and 279 Au lines in Ge rings ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

Entry  Fri Mar 3 13:54:41 2023, IP. KWL, Runs, , General, beam energy measurement 

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

Entry  Fri Mar 3 14:22:12 2023, IP, Runs, , General,  

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

Entry  Fri Mar 3 23:38:28 2023, SP, Runs, , General, How different Ge count ge_en_cal_230303_2337.png

All germanium detecors look reasonable, as attached.

Entry  Sat Mar 4 08:27:23 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57

LF = 3.11

Plunger ;

Planger run = 437

Supposed Dist=10

Micrometer = 10.1

Position = 10.4

Voltage = 7.923

Beam dumb = 0.75 nA

Collimeter =0.5 nA

Everythings is looking stable.

Entry  Sat Mar 4 09:51:32 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43

LF = 3.45

Plunger ;

Planger run = 452

Supposed Dist=10

Micrometer = 10.4

Position = 10.4

Voltage = 7.926

Beam dumb = 1 nA

Collimeter =0.5 nA

Everythings is looking stable.

Entry  Sat Mar 4 11:06:31 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03

LF = 3.36

Plunger ;

Planger run = 465

Supposed Dist=10

Micrometer = 10.5

Position = 10.5

Voltage = 7.91

Beam dumb = 0.75 nA

Collimeter =0.6 nA

Everythings is looking stable.

Entry  Sat Mar 4 12:34:52 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17

LF = 3.25

Plunger ;

Planger run = 479

Supposed Dist=10

Micrometer = 10.6

Position = 10.5

Voltage = 7.908

Beam dumb = 0.8 nA

Collimeter =0.7 nA

Everythings continues to stable.

Entry  Sat Mar 4 13:43:20 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30

LF = 3.70

Plunger ;

Planger run = 491

Supposed Dist=10

Micrometer = 10.9

Position = 10.4

Voltage = 7.924

Beam dumb = 1 nA

Collimeter =0.7 nA

Everythings continues to stable.

Entry  Sat Mar 4 15:02:54 2023, mgb, Runs, , General, running stable 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99

LF = 3.35

Plunger ;

Planger run = 504

Supposed Dist=10

Micrometer = 11.1

Position = 10.2

Voltage = 8.964

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 16:06:19 2023, mgb, Runs, , General,  

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat

RU = 6.25

LF = 3.39

Plunger ;

Planger run = 515

Supposed Dist=10 um

Actual Distance = 9.7 um

Position = 10.3 um

Voltage = 7.938 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 17:09:13 2023, mgb, Runs, , General,  

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat

RU = 6.45 MB/s

LF = 3.45 MB/s

Plunger ;

Planger run = 525

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.2 um

Position = 10.1 um

Voltage = 7.943 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 18:02:48 2023, mgb, Runs, , General,  

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat

RU = 6.39 MB/s

LF = 3.42 MB/s

Plunger ;

Planger run = 534

Supposed Dist=10 um

Actual Distance = 9.9 um

micrometer = 11.4 um

Position = 10.3 um

Voltage = 7.933 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 19:14:30 2023, AF, Runs, , General,  

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0144.caendat

RU = 6.46 MB/s

LF = 3.48 MB/s

Plunger ;

Planger run = 546

Supposed Dist=10 um

Actual Distance = 10 um

micrometer = 11.4 um

Position = 10.4 um

Voltage = 7.923 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 20:56:40 2023, AF, Runs, , General,  

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 563

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.0 um

Position = 10.1 um

Voltage = 7.947 V

Beam dumb =

Collimeter =

 

Stopped at 10.51 pm

Plan: change the distance between the target and the stopper

Plunger run nr at stop: 582

beam current at stop: 0.9 enA at the beam dump

 

Entry  Sat Mar 4 23:28:16 2023, AF, Runs, , General,  

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0000.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 585

Supposed Dist=240 um

Actual Distance = 240 (+60) um

Position = 240.9 um

Voltage = 2.717 V

Beam dumb = 0.75 - 1.0 enA

Collimeter = 0.75-1.0 enA

 

ELOG V3.1.5-fc6679b