EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 2 of 14
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
19
Thu Mar 2 05:33:34 2023
ost-dod
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
20
Thu Mar 2 07:40:55 2023
ost-dod
Runs
General
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
21
Thu Mar 2 09:05:43 2023
DOD
Problems
Sulphur on aluminium fusion-evaporation reactions
Using the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
22
Thu Mar 2 09:20:17 2023
ost-mgb
Runs
General
Rates
Run 27 with single gamma trigger
Plunger feedback system is not
conected.
24
Thu Mar 2 09:49:13 2023
BS
Runs
General
run 28 started
run 28 started
25
Thu Mar 2 10:18:14 2023
ost-mgb
Runs
General
run 29 started
Run 29 with single gamma trigger
Plunger feedback system is not
connected.
26
Thu Mar 2 11:14:44 2023
ost-mgb
Runs
General
un 29 with single gamma trigger
Plunger feedback system is not
connected.
27
Thu Mar 2 11:17:54 2023
BS
Runs
Run 29 stopped
We will change the trigger and we stopped
the run number 29
28
Thu Mar 2 11:19:06 2023
BS
Runs
General
Run 30 Starts
We hane now g-g trigger started.
Run 30 started
29
Thu Mar 2 12:09:44 2023
ost-mgb
Runs
General
beam stop,
30
Thu Mar 2 13:50:50 2023
BS
Runs
General
Run 30 Continueed
EAGLE is closed now
We gave a break to test the cable
connection of target, degrader, beam dump
31
Thu Mar 2 14:59:32 2023
mgb
Runs
General
Data
32
Thu Mar 2 15:15:40 2023
mgb
Runs
General
beam stopped. eagle is opened and run 30 continues
Data
Position = 522.6
Supposed = 520
33
Thu Mar 2 16:06:17 2023
A.T.
Runs
General
Data
Position = 522.6
Supposed = 520
34
Thu Mar 2 16:40:45 2023
MP
Runs
General
changing the plunger distance to minimum.
Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
35
Thu Mar 2 17:23:53 2023
BS
Runs
General
Plunger Informations
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
36
Thu Mar 2 17:25:36 2023
BS
Runs
General
Run 32 Stopped
Run 32 Stopped
37
Thu Mar 2 17:28:21 2023
BS
Runs
Run 33 Started
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
38
Thu Mar 2 23:01:21 2023
A.T.
Runs
General
Run 34 started
Run 34 Started (33 was stopped due to acquisition
problems)
Plunger Run : 105
39
Thu Mar 2 23:04:01 2023
GJ
Problem Fixed
Hardware
Connection of the plunger cables, grounding, beam read-out for the operators
Notes of the measurements with different conditions
are attached.
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b