EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 7 of 14  ELOG logo
ID Date Author Type test Category Subjectdown Text Attachments
  179   Thu Mar 9 05:19:33 2023 WPRuns GeneralGeneralrun control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat

 
  
  180   Thu Mar 9 06:24:10 2023 WPRuns GeneralGeneralrun control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat

 
  
  181   Thu Mar 9 07:28:59 2023 WPRuns GeneralGeneralrun control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0042.caendat

 
  
  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectraGe rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2.
 ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png 
  159   Wed Mar 8 10:27:26 2023 IK, BSOther GeneralGe spectraCount rates are still a bit high (~2.6kHz
for EAGLE det4). Ge spectra looks fine compared
to earlier ones.
 Screenshot_2023-03-08_10-24-20.png 
  164   Wed Mar 8 13:04:05 2023 IKRuns GeneralGe spectraGe spectra after #161 - #162 beam tuning.  Screenshot_2023-03-08_13-03-10.png 
  206   Fri Mar 10 16:14:19 2023 IPOther GeneralGe - the rate is higherFrom 13:00 the rate of the Ge [the chanel
4] is a bit higher (~2.15 kHz). And also
the rate of other detectors.
 Screenshot_2023-03-10_16-10-45.png 
  222   Fri Mar 10 22:40:00 2023 IPOther GeneralGe - the rate is higherthe rates of detectors are still a bit
higher

 Screenshot_2023-03-10_22-37-27.png 
  135   Tue Mar 7 14:03:20 2023 BSRuns GeneralCounting Rates 

 
 Screenshot_2023-03-07_14-01-56.png 
  39   Thu Mar 2 23:04:01 2023 GJProblem Fixed HardwareConnection of the plunger cables, grounding, beam read-out for the operatorsNotes of the measurements with different conditions
are attached.
 Slp823030222550.pdf 
  230   Sat Mar 11 11:39:55 2023 EGProblems  Buffers clearingat 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly?
  
  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.Issue described in #61 continues to
persist.

Beam stopped from 19:20 to 19:32,
 333626140_152534624340296_7230383118242592907_n.jpg 
  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solvedCurrent readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding
  
  131   Tue Mar 7 09:56:07 2023 OSTProblems mechanicsBeam stopped and operators controlling number 15_Ge dedector.    
  186   Thu Mar 9 13:37:33 2023 OSTOther BeamBeam stopped 13:37-13:49 for control again.    
  166   Wed Mar 8 15:57:53 2023 IK, AMProblems GeneralBeam issueno beam in 15:52 - 16:21 due to power supply
problem
  
  231   Sat Mar 11 12:42:42 2023 EGOther  Beam intensity reductionAgain beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4. 
Beam intensity reduction requested. 1.8 kHz
  
  234   Sat Mar 11 15:16:31 2023 EGOther  Beam intensity reduced againAgain beam intensity to high. Reduced to
2 kHz on ch4 GE
  
  232   Sat Mar 11 14:15:55 2023 EGRuns  Beam intensity rapid increase 14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes.
  
  233   Sat Mar 11 14:42:28 2023 EGRuns  Beam instabilitiesLarge beam intensity instabilities from
14:10 till 14:40.  Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned
  
ELOG V3.1.5-fc6679b