EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 8 of 14  ELOG logo
Entry  Mon Mar 6 09:53:06 2023, OST, Problems, , Beam, Beam dump decreased 2.5 nA to 1.5 nA- stopped run 41 

9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA

Entry  Sun Mar 5 15:07:24 2023, mgb, Runs, , General, Beam dump decreased 1.0 nA to 0.75 

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s

LF = 4.11 MB/s

Plunger ;

Planger run = 745

Supposed Dist=240 um

Micrometer = 187.5 um

Position = 241.1 um

Actual distance = 240.6 um

Voltage = 2.715 V

Beam dumb = 0.75 nA

Collimeter =0.65 nA

 

Entry  Sun Mar 12 09:15:00 2023, EG, Other, , , Array_monitors mat refresh synchronization 

Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....

(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour is dysplayed. Not very usefull and (I suppose) missleading information.


 

Entry  Fri Mar 3 13:43:56 2023, IP. KWL, Runs, , , 511 annihilation and 279 Au lines in Ge rings ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

Entry  Tue Jan 23 16:55:21 2024, yes, Other, , , 106Cd certificate Slp823030223120.pdf
 
Entry  Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,  

Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.

Entry  Wed Mar 1 21:59:45 2023, MB BS, Other, , General,  

Offset of the plunger is 60 um.

new distcal01_vac_after_opening

Entry  Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0011.caendat

 

RU = 5.58 Mb/s

LF = 3.72 Mb/s

Entry  Thu Mar 2 04:17:40 2023, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0027.caendat

 

RU = 5.10 Mb/s

LF = 3.75 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat

 

RU = 4.70 Mb/s

LF = 3.20 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat

 

RU = 4.48 Mb/s

LF = 4.07 Mb/s

Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,  

Run 27 stopped

Entry  Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,  

un 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat

 

RU = 40.1 Mb/s

LF = 12.5 Mb/s

Entry  Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,  

beam stop,

Entry  Thu Mar 2 14:59:32 2023, mgb, Runs, , General,  

 

 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

Entry  Fri Mar 3 01:15:27 2023, mgb, Runs, , General,  

 

plunger run # 126

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 2.3 enA

Collimator  1.0 enA

 

RU : 5.44 MB/s

LF : 8.40 MB/s

Supposed Distance = 10 um

position of the target = 10.9 um

micrometer = 10.3 um

Voltage = 7.896 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

Entry  Fri Mar 3 02:20:46 2023, mgb, Runs, , General,  

plunger run # 137

 

Beam dump 2.5 enA

Collimator  1.0 enA

02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat

RU : 4.70 MB/s

LF : 7.92 MB/s

Supposed Distance = 10 um

position of the target = 10.7 um

micrometer = 9.8 um

Voltage = 7.89 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

Entry  Fri Mar 3 03:19:34 2023, mgb, Runs, , General,  

plunger run # 147

 

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat

RU : 4.90 MB/s

LF : 8.07 MB/s

Supposed Distance = 10 um

position of the target = 10.5 um

micrometer = 9.2 um

Voltage = 7.93 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

Entry  Fri Mar 3 04:15:32 2023, mgb, Runs, , General,  

plunger run # 157

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat

RU : 4.79 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.9 um

Voltage = 7.94 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

ELOG V3.1.5-fc6679b