EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 7 of 14  ELOG logo
Entry  Thu Mar 9 05:19:33 2023, WP, Runs, , General, General 

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat

 

 

RU =  7.15 MB/s

LF =   3.68 MB/s

plunger:

plunger run = 779

actual distance =  533.1 um

supposed distance = 532.7 um

micrometer =   533.4 um

position =  299.6 um

voltage =  1.66 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

Entry  Thu Mar 9 06:24:10 2023, WP, Runs, , General, General 

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat

 

 

RU =  7.39 MB/s

LF =   3.60 MB/s

plunger:

plunger run = 790

actual distance =  532.8 um

supposed distance = 532.7 um

micrometer =   533.6 um

position =  300.1 um

voltage =  1.657 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

Entry  Thu Mar 9 07:28:59 2023, WP, Runs, , General, General 

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0042.caendat

 

 

 

RU =  7.20 MB/s

LF =   3.54 MB/s

plunger:

plunger run = 801

actual distance =  533.2 um

supposed distance = 532.7 um

micrometer =   533.6 um

position =  300.7 um

voltage =  1.66 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

Entry  Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra Screenshot_2023-03-08_10-24-20.png

Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 

Entry  Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra Screenshot_2023-03-08_13-03-10.png

Ge spectra after #161 - #162 beam tuning.

Entry  Fri Mar 10 16:14:19 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_16-10-45.png

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

    Reply  Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_22-37-27.png

the rates of detectors are still a bit higher

Quote:

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

 

Entry  Tue Mar 7 14:03:20 2023, BS, Runs, , General, Counting Rates Screenshot_2023-03-07_14-01-56.png

 

 

Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
What is read out by the operators on the blue cable should be multiplied by 7 to get a real value in enA.
Entry  Sat Mar 11 11:39:55 2023, EG, Problems, , , Buffers clearing 

at 11:34:50 sek on 11 march a spike in counting rate of some Ge detectors is observed. Buffers not cleared properly?


 

Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 

Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire was tightened, which seemingly resolved the issue (stability of beamdump readout).   

Entry  Tue Mar 7 09:56:07 2023, OST, Problems, , mechanics, Beam stopped and operators controlling number 15_Ge dedector. 
 
Entry  Thu Mar 9 13:37:33 2023, OST, Other, , Beam, Beam stopped 13:37-13:49 for control again. 
 
Entry  Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue 

no beam in 15:52 - 16:21 due to power supply problem

Entry  Sat Mar 11 12:42:42 2023, EG, Other, , , Beam intensity reduction 

Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4.  Beam intensity reduction requested. 1.8 kHz on ch4 after reduction.

Entry  Sat Mar 11 15:16:31 2023, EG, Other, , , Beam intensity reduced again 

Again beam intensity to high. Reduced to 2 kHz on ch4 GE

Entry  Sat Mar 11 14:15:55 2023, EG, Runs, , , Beam intensity rapid increase  

14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal after 4 minutes.

Entry  Sat Mar 11 14:42:28 2023, EG, Runs, , , Beam instabilities 

Large beam intensity instabilities from 14:10 till 14:40.  Beam intensity reduction requested. CH4 on Total rate EAGLE_0 returned to 1.9kHz. Intensity became stable.

 

ELOG V3.1.5-fc6679b