EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments, Page 7 of 7  ELOG logo
Entry  Sun Jun 18 02:57:23 2023, NM, MR, Runs, , General, Run 17 Capture_d’écran_du_2023-06-18_02-58-47.pngCapture_d’écran_du_2023-06-18_02-58-39.png
ch0: 24.96V 10.87uA

ch2: 25.01V 6.26uA

ch3: 25.00V 4.86uA
Entry  Sun Jun 18 03:45:22 2023, NM, MR, Problems, , General, Ru 17 stopped 
Run 17 stopped because accelerator discharged

 
Entry  Sun Jun 18 01:30:21 2023, NM, MR, Other, , Other, Particle spectra Capture_d’écran_du_2023-06-18_01-13-56.png
We observed a decrease in the particle energies. We attached one channel comparing with the same but from run 5. We keep running.
 
Entry  Fri Jun 16 09:37:55 2023, GC KHK GL, Runs, , General, First run with 62Ni on the target Capture_d’écran_du_2023-06-16_09-37-01.png
beam current 20 enA

charge state 17

energy is yet to be checked (tuned to 210 MeV of 58Ni, Alain has to recalculate and change to 230 MeV of 62Ni)
Entry  Thu Jun 15 11:29:03 2023, KHK, GC, Other, , General, DSSD angles and energies E_beam=233 MeV  
Angle (°) Emin Emax
(MeV) (MeV)
128 46.34 80.95
Entry  Sat Jun 17 20:42:04 2023, DK, KS, KHK, Problems, , tests, DSSD - channels S1 0-5 - efficiency drop Capture_d’écran_du_2023-06-17_20-36-28.png
we reset the DAQ and did the module_restart with the card IP 192.168.3.78

no change

we restarted the HV DSSD - no change
Entry  Mon Jun 5 12:29:06 2023, KHK, Other, , General, 62Ni coulex - proposal 62Ni_COULEX_Orsay.pdf
 
ELOG V3.1.5-fc6679b