| ID |
Date |
Author |
Type |
test |
Category |
Subject |
Text |
 |
|
43
|
Fri Mar 3 02:23:45 2023 |
GJ | Problems | | Software | builder gate, TS offsets | Data from current run - 35, with limited beam
current and rates - see a recent post by
Güray.
|
|
|
175
|
Thu Mar 9 01:41:50 2023 |
GJ | Problem Fixed | | Hardware | TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 | Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the
|
|
|
256
|
Sun Mar 12 20:31:45 2023 |
GJ | Runs | | General | run_61 - target and stopper and beam dump dismounted. | target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained.
|
|
|
258
|
Sun Mar 12 21:33:54 2023 |
GJ | Runs | | General | run 63 - 152 Eu during LN2 filling | |
|
|
228
|
Sat Mar 11 09:29:48 2023 |
EG | Other | | | current exeriment parameters as requested in the manual for shifters | 41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok |
|
|
229
|
Sat Mar 11 10:46:37 2023 |
EG | Other | Beam intensity | | | ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz. |
|
|
230
|
Sat Mar 11 11:39:55 2023 |
EG | Problems | | | Buffers clearing | at 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly? |
|
|
231
|
Sat Mar 11 12:42:42 2023 |
EG | Other | | | Beam intensity reduction | Again beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4.
Beam intensity reduction requested. 1.8 kHz |
|
|
232
|
Sat Mar 11 14:15:55 2023 |
EG | Runs | | | Beam intensity rapid increase | 14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes. |
|
|
233
|
Sat Mar 11 14:42:28 2023 |
EG | Runs | | | Beam instabilities | Large beam intensity instabilities from
14:10 till 14:40. Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned |
|
|
234
|
Sat Mar 11 15:16:31 2023 |
EG | Other | | | Beam intensity reduced again | Again beam intensity to high. Reduced to
2 kHz on ch4 GE |
|
|
250
|
Sun Mar 12 09:15:00 2023 |
EG | Other | | | Array_monitors mat refresh synchronization | Beam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but.... |
|
|
251
|
Sun Mar 12 13:20:00 2023 |
EG | Problems | | | No Data | For a split second a red "NO DATA"
notification appeared in the top right corner
of Counting rates dashboard. |
|
|
18
|
Thu Mar 2 04:17:40 2023 |
DOD | Runs | | General | | Run 27 with single gamma trigger
Plunger feedback system is not
conected. |
|
|
21
|
Thu Mar 2 09:05:43 2023 |
DOD | Problems | | | Sulphur on aluminium fusion-evaporation reactions | Using the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g. |
|
|
259
|
Sun Mar 12 22:52:36 2023 |
Bahadir Saygi | Other | | General | Plunger Run Files | Plunger run files for later to calculate
error in the distance |
 |
|
93
|
Mon Mar 6 00:43:27 2023 |
BS, GJ | Runs | | General | Run 40 Started | Before this run TSs were moved on the LF
level, so the BU has easier job to do and
everything is more stable. |
|
|
15
|
Wed Mar 1 20:10:38 2023 |
BS, DOD | Other | | General | | Run 26 is going on but not much for the
moment in terms of any useful data.
And half of the EAGLE is opened. |
|
|
17
|
Thu Mar 2 00:30:29 2023 |
BS, DOD | Runs | | General | | Run 27 with single gamma trigger
Plunger feedback system is not
conected. |
|
|
4
|
Mon Feb 27 12:10:24 2023 |
BS | Other | | Target | target | Support of Target = 1.5 mg/cm2 Ta
Target = 1.0 mg/cm2 Cd-106
Stopper = 10 mg/cm2 Au
|
|