EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
ID Date Author Type test Categorydown Subject Text Attachments
  131   Tue Mar 7 09:56:07 2023 OSTProblems mechanicsBeam stopped and operators controlling number 15_Ge dedector.    
  4   Mon Feb 27 12:10:24 2023 BSOther TargettargetSupport of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
  
  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mountedNew target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
  
  43   Fri Mar 3 02:23:45 2023 GJProblems Softwarebuilder gate, TS offsetsData from current run - 35, with limited beam
current and rates - see a recent post by
Güray.
 run_0035_BU_lenghts.png 
  130   Tue Mar 7 09:41:44 2023 OSTProblems Softwarenumber_Ge_15 dedector not taking dataafter run 45 I reset all spectrums and
number_Ge_15 dedector not
taking data.
  
  139   Tue Mar 7 15:12:06 2023 OSTProblems Softwarerun 45 stopped14:30 pm to 15:00 run 45 crashed and stopped   
  140   Tue Mar 7 15:14:29 2023 OSTProblem Fixed SoftwareRun 46 started-15_Ge and number 5 anticompton working now.VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and
number 5 anticompton dedector working
  
  223   Fri Mar 10 23:27:51 2023 IPProblems Softwarerun 53 - stoppedthe daq crashed at 22:43 -- problem with
Local Filter

the run 53 - stopped
  
  224   Fri Mar 10 23:29:43 2023 IPProblem Fixed Softwarenew run 54the daq resolved at 23:15

start new run: run 54
  
  244   Sun Mar 12 00:09:35 2023 AFProblem Fixed Softwarecaen_shifted correction in spy & grewareneda_psdcaen_positions.txt had weird values
for three first detectors, especially neda_02.
  
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junkRun 37 stopped by itslelf at 15:43. This
was noticed at about 16:10 by observing that
grafana data rates do not change.
  
  195   Fri Mar 10 01:28:48 2023 AMProblems OtherPlunger distancelonger break during chane of plunger distance
due to technical problem, you can not move
plunger to larger distances, so now we are
  
  245   Sun Mar 12 03:05:45 2023 GJ, AFProblems Networkno data flux visible in grafena, LF prints "write: Broken pipe"As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
  
  39   Thu Mar 2 23:04:01 2023 GJProblem Fixed HardwareConnection of the plunger cables, grounding, beam read-out for the operatorsNotes of the measurements with different conditions
are attached.
 Slp823030222550.pdf 
  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solvedCurrent readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding
  
  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.Issue described in #61 continues to
persist.

Beam stopped from 19:20 to 19:32,
 333626140_152534624340296_7230383118242592907_n.jpg 
  175   Thu Mar 9 01:41:50 2023 GJProblem Fixed HardwareTS zeroing - cables to S-IN from VME controller - between runs 49 and 50Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the 
  
  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal   HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf 
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participantsTo be filled in, with affiliation and email.

Presumably, for later publication
purposes.
  
  3   Mon Feb 27 02:49:10 2023 GJRuns Generalcalibs - 2x 152Eu - run 0Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
  
ELOG V3.1.5-fc6679b