19
|
Thu Mar 2 05:33:34 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat
RU = 4.70 Mb/s
LF = 3.20 Mb/s
Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates. |
|
20
|
Thu Mar 2 07:40:55 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat
RU = 4.48 Mb/s
LF = 4.07 Mb/s
Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates. |
|
21
|
Thu Mar 2 09:05:43 2023 |
DOD | Problems | | | Sulphur on aluminium fusion-evaporation reactions |
Using the data which we've sorted to date, I looked into the gamma-gamma coincidences and have identified a number of nuclei e.g. 50Cr, 52Mn, 55Fe which would be consistent with fusion-evaporation reactions involving the sulphur-32 projectiles and aluminium-27. Such reactions would yield a 59Cu comound system and these channels would be populated as a result of the evaporation of a combination of alphas, protons and neutrons.
These lines are intense and the conicdences are very clear and clean. I think this suggests that the beam is hitting some aluminium components within the plunger chamber. This could be the plunger vessel itself or the target frame perhaps.
There is another interesting observation: some of the identified transitions are emitted from levels which have sub-ps lifetimes. At this plunger distance, we might expect these lines to be fully Doppler shifted as they would decay in-flight well in advance of reaching the stopper. Yet, we observe these lines with their non-Doppler shifted energies suggesting that they are not being emitted in-flight but rather at rest. This might suggest that the 32S+27Al reactions are taking place within some thick piece of aluminium. Some of the lines show signs of having been shifted in energy to some extent which might indicate that not all of the ions are completely stopped. The observed lineshapes seem to be consistent with the short-lived states showing evidence of Doppler shift while the decay of the "longer-lived" states (~9 ps) are very sharp.
I haven't slept for about 24 hours so I may be talking absolute sh*te (famous Scottish word). |
|
22
|
Thu Mar 2 09:20:17 2023 |
ost-mgb | Runs | | General | Rates |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat
RU = 6.25 Mb/s
LF = 4.06 Mb/s
09:15 beam stopped. data saved |
|
24
|
Thu Mar 2 09:49:13 2023 |
BS | Runs | | General | run 28 started |
run 28 started |
|
25
|
Thu Mar 2 10:18:14 2023 |
ost-mgb | Runs | | General | run 29 started |
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat
RU = 38.5 Mb/s
LF = 12.0 Mb/s
|
|
26
|
Thu Mar 2 11:14:44 2023 |
ost-mgb | Runs | | General | |
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat
RU = 40.1 Mb/s
LF = 12.5 Mb/s |
|
27
|
Thu Mar 2 11:17:54 2023 |
BS | Runs | | | Run 29 stopped |
We will change the trigger and we stopped the run number 29 |
|
28
|
Thu Mar 2 11:19:06 2023 |
BS | Runs | | General | Run 30 Starts |
We hane now g-g trigger started.
Run 30 started |
|
29
|
Thu Mar 2 12:09:44 2023 |
ost-mgb | Runs | | General | |
beam stop, |
|
30
|
Thu Mar 2 13:50:50 2023 |
BS | Runs | | General | Run 30 Continueed |
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it.
But not much usefull data in it. |
|
31
|
Thu Mar 2 14:59:32 2023 |
mgb | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s |
|
32
|
Thu Mar 2 15:15:40 2023 |
mgb | Runs | | General | beam stopped. eagle is opened and run 30 continues |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
beam off and on and off. eagle is opened and run 30 continues
new cable is stucked
Cable test is going on |
|
33
|
Thu Mar 2 16:06:17 2023 |
A.T. | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
cables to colimeter are checked and replaced. |
|
34
|
Thu Mar 2 16:40:45 2023 |
MP | Runs | | General | changing the plunger distance to minimum. |
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
|
35
|
Thu Mar 2 17:23:53 2023 |
BS | Runs | | General | Plunger Informations |
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
|
|
36
|
Thu Mar 2 17:25:36 2023 |
BS | Runs | | General | Run 32 Stopped |
Run 32 Stopped |
|
37
|
Thu Mar 2 17:28:21 2023 |
BS | Runs | | | Run 33 Started |
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
20:50 Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam.
run stop 22:53 acquisition problem |
|
38
|
Thu Mar 2 23:01:21 2023 |
A.T. | Runs | | General | Run 34 started |
Run 34 Started (33 was stopped due to acquisition problems)
Plunger Run : 105
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 12.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
at the first 10 min det # 5 was switched off
Ge det # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
old scalers: 5 2.5 8 5 8.5 3 5 1.5 5 8.5 8.5 7.5 2.7 2.7 5 kHz
new (Grzes) 1.7 1 3.2 1.8 3.6 0.9 1.7 0.45 1.7 3.5 3.2 3.1 1. 1. 1.7 kHz
beam dump current 3nA
det # 5 scaler 7.7 kHz
stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run) |
|
39
|
Thu Mar 2 23:04:01 2023 |
GJ | Problem Fixed | | Hardware | Connection of the plunger cables, grounding, beam read-out for the operators |
Notes of the measurements with different conditions are attached.
Conclusion:
What is read out by the operators on the blue cable should be multiplied by 7 to get a real value in enA. |
| Attachment 1: Slp823030222550.pdf
|
|