EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
ID Date Author Type testdown Category Subject Text Attachments
  19   Thu Mar 2 05:33:34 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  20   Thu Mar 2 07:40:55 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  21   Thu Mar 2 09:05:43 2023 DODProblems  Sulphur on aluminium fusion-evaporation reactionsUsing  the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
  
  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRatesRun 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 startedrun 28 started   
  25   Thu Mar 2 10:18:14 2023 ost-mgbRuns Generalrun 29 startedRun 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  26   Thu Mar 2 11:14:44 2023 ost-mgbRuns General un 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stoppedWe will change the trigger and we stopped
the run number 29
  
  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 StartsWe hane now g-g trigger started.

Run 30 started
  
  29   Thu Mar 2 12:09:44 2023 ost-mgbRuns General beam stop,   
  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 ContinueedEAGLE is closed now

We gave a break to test the cable
connection of target, degrader, beam dump
  
  31   Thu Mar 2 14:59:32 2023 mgbRuns General  

 

Data
  
  32   Thu Mar 2 15:15:40 2023 mgbRuns Generalbeam stopped. eagle is opened and run 30 continuesData

Position = 522.6

Supposed = 520
  
  33   Thu Mar 2 16:06:17 2023 A.T.Runs General Data

Position = 522.6

Supposed = 520
  
  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
  
  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger InformationsPlunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um
  
  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 StoppedRun 32 Stopped   
  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 StartedRun 33 Started

Plunger Run : 48

Supposed Distance = 10 um
  
  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 startedRun 34 Started (33 was stopped due to acquisition
problems)

Plunger Run : 105
  
  39   Thu Mar 2 23:04:01 2023 GJProblem Fixed HardwareConnection of the plunger cables, grounding, beam read-out for the operatorsNotes of the measurements with different conditions
are attached.
 Slp823030222550.pdf 
ELOG V3.1.5-fc6679b