EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 14  ELOG logo
Entry  Wed Mar 8 00:31:05 2023, KS, KSz, Runs, , General, Run 47 standard info 
run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s
Entry  Wed Mar 8 01:24:04 2023, BS, Runs, , General, Run 47 Stopped to Change Distance Change 
Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495
Entry  Tue Mar 7 15:14:29 2023, OST, Problem Fixed, , Software, Run 46 started-15_Ge and number 5 anticompton working now. 
VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 
Entry  Tue Mar 7 03:26:54 2023, JD, DW, Runs, , General, Run 44 started 
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0000.caendat

RU =  6.46 MB/s
Entry  Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started 
Run 41 started

Plunger distance 10 um
Entry  Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped 
Run 40 stooped
Entry  Mon Mar 6 00:43:27 2023, BS, GJ, Runs, , General, Run 40 Started LocalFilter.conf
Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 
Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 
Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
Entry  Thu Mar 2 23:01:21 2023, A.T., Runs, , General, Run 34 started 
Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um
Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 
Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um
Entry  Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped 
Run 32 Stopped
Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 
We hane now g-g trigger started.

Run 30 started
Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 
EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.
Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 
We will change the trigger and we stopped the run number 29
Entry  Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started 
Run 26 Started

 

Beam 9 enA on the collimator
Entry  Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started 
Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.
Entry  Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped 
Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.
Entry  Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates 
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Wed Mar 8 16:53:07 2023, BS, Runs, , General, Rates Screenshot_2023-03-08_16-52-03.pngScreenshot_2023-03-08_16-51-42.png
 
Entry  Wed Mar 8 18:02:43 2023, BS, Runs, , General, Rates Screenshot_2023-03-08_18-01-49.png
 
ELOG V3.1.5-fc6679b