EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Type test Category Subjectdown
  149   Wed Mar 8 00:31:05 2023 KS, KSzRuns GeneralRun 47 standard info

run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s

LF =   3.32 MB/s

plunger:

plunger run = 491

actual distance =  282.9 um

supposed distance = 282.7 um

micrometer =   285.12 um

position =  50.2 um

voltage =  2.963 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

  151   Wed Mar 8 01:24:04 2023 BSRuns GeneralRun 47 Stopped to Change Distance Change

Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495

  140   Tue Mar 7 15:14:29 2023 OSTProblem Fixed SoftwareRun 46 started-15_Ge and number 5 anticompton working now.

VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 

  122   Tue Mar 7 03:26:54 2023 JD, DWRuns GeneralRun 44 started

run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0000.caendat

RU =  6.46 MB/s

LF =  3.39 MB/s

plunger:

plunger run = 279

actual distance = 282.7 um

supposed distance =  282.7 um

micrometer =  285.1 um

position = 49.9 um

voltage = 2.966 V

Beam dump = 0.7-1 nA

Collimater= 0.5 nA

  95   Mon Mar 6 01:01:26 2023 BSRuns GeneralRun 41 started

Run 41 started

Plunger distance 10 um

  94   Mon Mar 6 01:00:29 2023 BSRuns GeneralRun 40 stooped

Run 40 stooped

  93   Mon Mar 6 00:43:27 2023 BS, GJRuns GeneralRun 40 Started

Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 

 

Run 40 Started.

New target

Offset 100 um

RUN CONTROL = 40

Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat

RU = 7.21 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 8

0-Point = 232, 7 um

Supposed Distance = 234,7 um

Micrometer = 187.5 um

Position = 241.1 um

Actual Distance = 234,5 um

Voltage =4,106V

Beam dumb =

Collimeter =

  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 started

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 started

Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 12.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

at the first 10 min det # 5 was switched off

Ge det #            1         2        3          4         5        6          7          8          9           10           11          12           13         14         15

old scalers:         5        2.5      8          5         8.5     3          5         1.5        5           8.5          8.5          7.5         2.7        2.7         5      kHz

new (Grzes)        1.7     1         3.2       1.8      3.6     0.9       1.7       0.45    1.7          3.5         3.2          3.1         1.           1.          1.7    kHz

 

beam dump current 3nA

det # 5 scaler  7.7   kHz

stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run)

  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 Started

Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

20:50   Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam. 

run stop 22:53 acquisition problem

  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 Stopped

Run 32 Stopped

  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 Starts

We hane now g-g trigger started.

Run 30 started

  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 Continueed

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stopped

We will change the trigger and we stopped the run number 29

  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 Started

Run 26 Started

 

Beam 9 enA on the collimator

  13   Wed Mar 1 16:07:49 2023 BSRuns  Run 24 Started

Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.

  12   Wed Mar 1 16:06:50 2023 BSRuns  Run 23 Stopped

Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.

The chamber was opened and observed some yellow spots

seen over the Cd target.

  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRates

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat

 

RU = 6.25 Mb/s

LF = 4.06 Mb/s

09:15 beam stopped. data saved

  168   Wed Mar 8 16:53:07 2023 BSRuns GeneralRates
  170   Wed Mar 8 18:02:43 2023 BSRuns GeneralRates
ELOG V3.1.5-fc6679b