ID Date Author Type test Category Subjectdown Text Attachments
  149   Wed Mar 8 00:31:05 2023 KS, KSzRuns GeneralRun 47 standard inforun control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s
  
  151   Wed Mar 8 01:24:04 2023 BSRuns GeneralRun 47 Stopped to Change Distance ChangeRun 47 stopped and distance changed from
50 um (+ 100 um offset) to 150 um (+ 100
um offset)
  
  140   Tue Mar 7 15:14:29 2023 OSTProblem Fixed SoftwareRun 46 started-15_Ge and number 5 anticompton working now.VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and
number 5 anticompton dedector working
  
  122   Tue Mar 7 03:26:54 2023 JD, DWRuns GeneralRun 44 startedrun control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0000.caendat

RU =  6.46 MB/s
  
  95   Mon Mar 6 01:01:26 2023 BSRuns GeneralRun 41 startedRun 41 started

Plunger distance 10 um
  
  94   Mon Mar 6 01:00:29 2023 BSRuns GeneralRun 40 stoopedRun 40 stooped   
  93   Mon Mar 6 00:43:27 2023 BS, GJRuns GeneralRun 40 StartedBefore this run TSs were moved on the LF
level, so the BU has easier job to do and
everything is more stable.
 LocalFilter.conf 
  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 startedRun 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
  
  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 startedRun 34 Started (33 was stopped due to acquisition
problems)

Plunger Run : 105
  
  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 StartedRun 33 Started

Plunger Run : 48

Supposed Distance = 10 um
  
  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 StoppedRun 32 Stopped   
  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 StartsWe hane now g-g trigger started.

Run 30 started
  
  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 ContinueedEAGLE is closed now

We gave a break to test the cable
connection of target, degrader, beam dump
  
  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stoppedWe will change the trigger and we stopped
the run number 29
  
  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 StartedRun 26 Started

 

Beam 9 enA on the collimator
  
  13   Wed Mar 1 16:07:49 2023 BSRuns  Run 24 StartedRun 24 has been started but no beams at
the moment.

EAGLE is opened.
  
  12   Wed Mar 1 16:06:50 2023 BSRuns  Run 23 StoppedRun 23 Stopped due to some unexpected spikes
in the

voltage of collimator.
  
  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRatesRun 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  168   Wed Mar 8 16:53:07 2023 BSRuns GeneralRates   Screenshot_2023-03-08_16-52-03.pngScreenshot_2023-03-08_16-51-42.png 
  170   Wed Mar 8 18:02:43 2023 BSRuns GeneralRates   Screenshot_2023-03-08_18-01-49.png 