EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  N-SI-85, all entries  ELOG logo
ID Date Author Type Category Subject Text Attachments
  1   Mon Feb 6 16:02:40 2023 pjn,khk,gp  shift listhttps://docs.google.com/spreadsheets/d/1ZyDHTmK5NTfsByGTj3iUzcIghXaAduJPavtb8AAH4hg/edit#gid=0   
  2   Mon Feb 6 16:07:59 2023 AllOtherGeneralTest run for HPGe with 60CoDetector in the visualtization online are
correctly calibrated.

Example of spectra.
 60Co-test.pngCapture_d’écran_du_2023-02-06_16-10-44.png 
  3   Tue Feb 7 02:17:49 2023 AllOtherGeneralDSSSD tunning fail - run 157We set the treshold for sectors except
for strip 0 up to strip 10 of sector 2 ,
where no signal seemed to be. We see the
  
  4   Tue Feb 7 02:34:56 2023 AllOtherGeneralrun 158DAQ started at 23-02-07 at 02h-55m-47s

 

alpha source
  
  5   Tue Feb 7 04:59:33 2023 allOtherGeneraltargetstargets:

 

1 empty
 IMG_0252.jpeg02f7fc90-a92a-4b29-85a9-51d6629dbf75.jpg 
  6   Tue Feb 7 13:44:39 2023 all  run 5 => DAQ started at : 23-02-07 at 12h-22m-08s                            
 
=> Shell name     
  
  7   Tue Feb 7 13:50:17 2023 All  run 6=> DAQ started at : 23-02-07 at 14h-12m-15s  
 
=> Shell name     
  
  8   Tue Feb 7 15:03:04 2023 All  Run 7==> DAQ started at : 23-02-07 at 14h-52m-42s                                                                                                                                                                     
 
==> Shell name     
 Capture_d’écran_du_2023-02-07_14-41-51.png 
  9   Tue Feb 7 15:42:57 2023 All  Beam problemBeam problems (with the ionizer). Stop
experiment until Thursday morning for maintenence.
  
  10   Tue Feb 7 15:58:35 2023 All  152EuRun for calibration with 152Eu source.
Not in the center.

 
  
  11   Tue Feb 7 16:41:23 2023 All  run_152_eff=> DAQ started at : 23-02-07 at 17h-03m-54s                                                                                                                                                                     
 
==> Shell name     
  
  12   Tue Feb 7 18:49:34 2023 all  60Co - calib=> DAQ started at : 23-02-07 at 19h-07m-11s    
 
=> Shell name     
  
  13   Thu Feb 9 22:51:01 2023 khk, pjn and othersOtherGeneralinstructions for Friday, 10.02.20231. when the beam comes, start with
the target position 1 - empty frame -
let the operators to center on it - the wheel
  
  14   Thu Feb 9 22:51:35 2023 khk, pjn and othersRoutine target positions, 09.02.2023Target positions:

1. empty

2. quartz
 IMG_0281.jpeg 
  15   Sun Feb 12 17:04:04 2023 Michalina, PJN, Piku, AnanyaOtherOthertrigger settings for S1_1level 4.7 mV (was 3.0)

 
 Capture_d’écran_du_2023-02-12_17-01-37.png 
  16   Sun Feb 12 17:13:35 2023 Michalina, PJN, Piku, AnanyaOtherOthertrigger settings for S1_2level 5.0 mV (was 3.0)

 
 Capture_d’écran_du_2023-02-12_17-14-00.png 
  17   Mon Feb 27 12:12:28 2023 pjnOtherGeneralShift plan Shift plan





 
  
  18   Mon Feb 27 12:48:07 2023 pjnOtherGeneralProposal   40Ca_pacalto_2015.pdf 
  19   Mon Mar 6 15:56:02 2023 All  Calibration with AmBeNi source for PARISStart at 12:23

 

==> DAQ started at : 23-03-06
 Capture_d’écran_du_2023-03-06_12-25-59.png 
  20   Mon Mar 6 16:27:08 2023 Iolanda, pjnOtherGeneralPARIS Configuration   Layouts_new.pdf 
  21   Mon Mar 6 16:28:42 2023 Iolanda, pjnOtherGeneralPARIS BIAS Voltages   Capture_d’écran_du_2023-03-06_16-16-11.pngCapture_d’écran_du_2023-03-06_16-16-55.pngCapture_d’écran_du_2023-03-06_16-16-25.pngCapture_d’écran_du_2023-03-06_16-15-57.pngCapture_d’écran_du_2023-03-06_16-16-39.png 
  22   Mon Mar 6 17:00:29 2023 All  Calibration with AmBeNi source for PARIS - part 2Start 16:44

Start a second calibration run
after changing the voltage offset of the
 Capture_d’écran_du_2023-03-06_17-00-18.png 
  23   Mon Mar 6 18:01:02 2023 pjnOtherOtherTarget changer problemTarget changet doesn't place taregts
in a correct position.

There is no possibility to put
 IMG_0435.jpeg 
  24   Mon Mar 6 22:10:30 2023 KWL PJNOtherGeneraltarget holderTarget holder - positions:

1  hole

2  quartz
 IMG-20230306-WA0000.jpg 
  25   Tue Mar 7 01:16:15 2023 Desi, Michalina  No target runBeam intensity is 0.3 enA

No target on the beam, test run
with wheel position 1
  
  26   Tue Mar 7 01:56:12 2023 Desi, Michalina  Run_1Run_1

Target position 4 - 208Pb 2 mg/cm^2

START: 01:52
  
  27   Tue Mar 7 04:48:22 2023 Desi, Michalina  Run 2We checked if the target is okay before
the start of this run.
On the camera it looked attached and
 Capture_d’écran_du_2023-03-07_04-47-27.pngCapture_d’écran_du_2023-03-07_05-00-00.png 
  28   Tue Mar 7 05:59:17 2023 Desi, Michalina  Run 3Start 06:00

 

 
  
  29   Tue Mar 7 08:23:17 2023 pjnRoutineGeneralrun 4start 8:20

beam cuurent: 0.3 enA

data stream 4.4 MB/s
 Capture_d’écran_du_2023-03-07_08-26-41.png 
  30   Tue Mar 7 09:06:31 2023 pjnRoutineGeneralrun 5start 9:05

Energy too high for the digitisers

Gain changed from 6 to
 Capture_d’écran_du_2023-03-07_09-07-37.png 
  31   Tue Mar 7 10:19:37 2023 pjn  Run 3for runs 1-3 energy was to high

corrected in run 4

 
  
  32   Tue Mar 7 15:32:02 2023 KWL PJNOtherGeneralimproving beam intensity and a note on the DSSD spectraOver a night 6/7 of March the beam intensity
was very low , i.e. ~ 0.3 enA (compared to
the 12 enA indicated in the proposal) 
 run5_sector2.pngrun4_sector2.pngrun3_sector2.png 
  33   Tue Mar 7 19:24:41 2023 Kasia WL, Kasia HK, PJN Generalrun with the empty frameHakim et al., played with the beam - they
put the C cone and tested it - it worked
for C but then it didn't work with Ca.
 hole2_test_scalers.png 
  34   Tue Mar 7 20:15:38 2023 pjnRoutineGeneralrun_6Start 20:13

Stop 21:03

Beam current 0.25enA
 Capture_d’écran_du_2023-03-07_20-16-26.png 
  35   Tue Mar 7 21:05:10 2023 KWL KHK PJN MKOMOtherGeneralrun 7 - change target to 197Auwe stopped run 6 with 208Pb target and
we change target to the 197Au in order to
see the target excitation in gamma ray spectrum.
 run7_197Au_pos6.png 
  36   Tue Mar 7 22:39:36 2023 Kasia WL, Kasia HK, PJNOther comaprison - Au and Pb targetsWe decided to change the target to 197Au,
2 mg/cm2 (pos 6) in order to check how the
gamma spectra look like.
 spectrum_Pb.pngspectrum_Au.png 
  37   Tue Mar 7 23:35:38 2023 PJN MKOM  run_8==> DAQ started at : 23-03-08 at 00h-01m-07s                                                                                                                                                                     
 
==> Shell name     
  
  38   Wed Mar 8 03:30:36 2023 MKOM  run_9==> DAQ started at : 23-03-08 at 01h-55m-20s                                                                                                                                                                     
 
==> Shell name     
  
  39   Wed Mar 8 05:33:15 2023 MKOM  run_10==> DAQ started at : 23-03-08 at 04h-08m-42s                                                                                                                                                                     
 
==> Shell name     
  
  40   Wed Mar 8 07:44:09 2023 MKOM  run_11==> DAQ started at : 23-03-08 at 05h-59m-45s
==> Shell name     
: ./.user_start.sh
  
  41   Wed Mar 8 07:45:21 2023 KHK, MKOM  run_12Stopped because Hakim wants to change the
source bottle to Ca - ammoniac

 
 run_12.png 
  42   Wed Mar 8 18:41:18 2023 KHK, PJN, KWL  distance DSSD - targetAccording to PJN: 3 cm, could be 3.5 cm
as well
 dssd.xlsx 
  43   Wed Mar 8 23:08:50 2023 lolandaOtherOtherPARIS - pol1 LaBr/CeBr calib##""Calibration points : 661,
1173, 1332, 4440 keV

Ene_cal_NSI85_PARIS.ods
 Ene_cal_NSI85_PARIS.odsSelection_001.pngSelection_002.pngSelection_002.png 
  44   Thu Mar 9 09:01:32 2023 Michalina, KasiaHK KasiaWL  beam is backWe have a beam back of intensity of 3 enA.
The beam is now tunned  through the
hole (position 1)
  
  45   Thu Mar 9 18:44:20 2023 Kasia WL, Kasia HK, GP, JW  beam on a target - run_15The beam is back after the adjustments
by Hakim and his team

Beam energy 165 MeV
 Capture_d’écran_du_2023-03-09_18-02-35.png 
  46   Thu Mar 9 18:48:11 2023 Kasia WL, Kasia HK, GP, JW  run_16Current 0.18 pnA

 

 
  
  47   Thu Mar 9 19:21:45 2023 Kasia WL, Kasia HK  run_17TIMER WAS SET by SOMEONE??? to 30 min

we changed it to 120 min

run stopped at 21:19
 run_17.png 
  48   Thu Mar 9 21:29:53 2023 Kasia WL, Kasia HKRoutine run 19started at 21:27

beam intensity 0.1 enA. This is
consisitent with observed counting rate in
 run_19.png 
  49   Thu Mar 9 23:12:39 2023 MMM, KHK  run_20
                                                                                                                                                                                                            
==> DAQ started at : 23-03-09 at
 Capture_d’écran_du_2023-03-09_23-14-40.png 
  50   Fri Mar 10 01:05:11 2023 MMMRoutineGeneralrun_21

==> DAQ started at : 23-03-10 at
 Capture_d’écran_du_2023-03-10_01-06-19.png 
  51   Fri Mar 10 03:04:49 2023 MMM  run_22=> DAQ started at : 23-03-10 at 03h-28m-32s                                                                                                                                                                     
 
==> Shell name     
 Capture_d’écran_du_2023-03-10_03-05-40.png 
  52   Fri Mar 10 05:08:04 2023 MMM  run_23==> DAQ started at : 23-03-10 at 05h-31m-27s                                                                                                                                                                     
 
==> Shell name     
 Capture_d’écran_du_2023-03-10_05-09-04.png 
  53   Fri Mar 10 07:08:59 2023 WaelyRoutineGeneralstop run 23DAQ stopped at 23-03-10 at 07h-31m-27s

shell name : ./.user_stop_trunkv3.sh                                                                                                                                                                         
 
  
  54   Fri Mar 10 07:09:55 2023 WaelyRoutineGeneralstart run 24 

DAQ started at : 23-03-10 at 07h-34m-02s   
 
 Capture_d’écran_du_2023-03-10_07-19-10.png 
  55   Fri Mar 10 09:12:13 2023 WaelyRoutineGeneralstop run 24 and go run 25daq stopped at 23-03-10 at 09h-34m-03s

 

 Capture_d’écran_du_2023-03-10_09-13-29.png 
  56   Fri Mar 10 09:23:29 2023 WaelyRoutineGeneralleakage currents6.2, 3.5 and 2.3 microA   
  57   Fri Mar 10 14:41:45 2023 KHK  end of the 40Ca experimentThe coulex of 40Ca experiment eneded at
11:05 AM due to the break of the ioniser
in the source.
  
  58   Fri Mar 10 14:45:33 2023 KHK, GP  152Eu - efficiency calibration152Eu source in the target position

06/10/2021

424E+3 Bq
 Capture_d’écran_du_2023-03-10_14-46-45.png 
  59   Fri Mar 10 16:34:47 2023 KHK, GP  60Co - efficiency calibration60Co source in the target position

06/08/2021

3917E+1 Bq
 Capture_d’écran_du_2023-03-10_16-35-02.png 
  60   Fri Mar 10 18:08:37 2023 KHK, GP, MMM  alpha calibration, setting 40Ca, pos 5 converterPu239+Am241+Cm244

433 alpha flux

24/06/2019
 Capture_d’écran_du_2023-03-10_18-12-25.png 
  61   Sat Mar 11 11:03:03 2023 KHK, MMM  alpha+pulser runs for 40CaWe connected pulser to the preamps (one
by one)

the following files contain the
 Capture_d’écran_du_2023-03-11_11-08-11.pngCapture_d’écran_du_2023-03-11_11-09-22.pngCapture_d’écran_du_2023-03-11_11-09-52.png 
  62   Sat Mar 11 11:14:41 2023 KHK, MMM  alpha run for Fe - converter setting 6=> DAQ started at : 23-03-11 at 11h-28m-54s                                                                                                                                                                     
 
==> Shell name     
 Capture_d’écran_du_2023-03-11_16-15-38.png 
  63   Sat Mar 11 17:07:49 2023 Kasia, Magda, Giorgia  PARIS and HPGe (4MeV) calibration with AmBeNi sourceStart 17:05

 

==> DAQ started at : 23-03-11
  
  64   Wed Feb 14 13:29:32 2024 Kasia i IwonaOtherOtherdo przeniesienia! testy FEB 2024 - detektor Orsay, Ringi    
ELOG V3.1.5-fc6679b