EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  N-SI-85, all entries  ELOG logo
Entry  Mon Feb 6 16:02:40 2023, pjn,khk,gp, , , shift list 
https://docs.google.com/spreadsheets/d/1ZyDHTmK5NTfsByGTj3iUzcIghXaAduJPavtb8AAH4hg/edit#gid=0
Entry  Mon Feb 6 16:07:59 2023, All, Other, General, Test run for HPGe with 60Co 60Co-test.pngCapture_d’écran_du_2023-02-06_16-10-44.png
Detector in the visualtization online are correctly calibrated.

Example of spectra.

 
Entry  Tue Feb 7 02:17:49 2023, All, Other, General, DSSSD tunning fail - run 157 
We set the treshold for sectors except for strip 0 up to strip 10 of sector 2 , where no signal seemed to be. We see the signals for rings one analog
(osciloscope from the exp room).

For the rings, we were not able to get rid of the pedestal and see the lines of interest from the alpha source. Also, the signal is very noisy.
Entry  Tue Feb 7 02:34:56 2023, All, Other, General, run 158 
DAQ started at 23-02-07 at 02h-55m-47s

 

alpha source
Entry  Tue Feb 7 04:59:33 2023, all, Other, General, targets IMG_0252.jpeg02f7fc90-a92a-4b29-85a9-51d6629dbf75.jpg
targets:

 

1 empty
Entry  Tue Feb 7 13:44:39 2023, all, , , run 5  
=> DAQ started at : 23-02-07 at 12h-22m-08s                            
 
=> Shell name      : ./.user_start.sh                                  
Entry  Tue Feb 7 13:50:17 2023, All, , , run 6 
=> DAQ started at : 23-02-07 at 14h-12m-15s    
=> Shell name      : ./.user_start.sh          
   File name       : run                     
Entry  Tue Feb 7 15:03:04 2023, All, , , Run 7 Capture_d’écran_du_2023-02-07_14-41-51.png
==> DAQ started at : 23-02-07 at 14h-52m-42s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Tue Feb 7 15:42:57 2023, All, , , Beam problem 
Beam problems (with the ionizer). Stop experiment until Thursday morning for maintenence.
Entry  Tue Feb 7 15:58:35 2023, All, , , 152Eu 
Run for calibration with 152Eu source. Not in the center.

 

==> DAQ started at : 23-02-07 at 16h-04m-03s      
Entry  Tue Feb 7 16:41:23 2023, All, , , run_152_eff 
=> DAQ started at : 23-02-07 at 17h-03m-54s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                                
Entry  Tue Feb 7 18:49:34 2023, all, , , 60Co - calib 
=> DAQ started at : 23-02-07 at 19h-07m-11s      
=> Shell name      : ./.user_start.sh            
   File name       : 60Co-calib                
Entry  Thu Feb 9 22:51:01 2023, khk, pjn and others, Other, General, instructions for Friday, 10.02.2023 
1. when the beam comes, start with the target position 1 - empty frame - let the operators to center on it - the wheel is now set
to 1

2. then check with the quartz - position 2 - but we would probably need about 4 pnA on a target to do that
Entry  Thu Feb 9 22:51:35 2023, khk, pjn and others, Routine, , target positions, 09.02.2023 IMG_0281.jpeg
Target positions:

1. empty

2. quartz
Entry  Sun Feb 12 17:04:04 2023, Michalina, PJN, Piku, Ananya, Other, Other, trigger settings for S1_1 Capture_d’écran_du_2023-02-12_17-01-37.png
level 4.7 mV (was 3.0)

 
Entry  Sun Feb 12 17:13:35 2023, Michalina, PJN, Piku, Ananya, Other, Other, trigger settings for S1_2 Capture_d’écran_du_2023-02-12_17-14-00.png
level 5.0 mV (was 3.0)

 
Entry  Mon Feb 27 12:12:28 2023, pjn, Other, General, Shift plan 
 Shift plan





 

06.03 Mon
07.03 Tue
Entry  Mon Feb 27 12:48:07 2023, pjn, Other, General, Proposal 40Ca_pacalto_2015.pdf
 
Entry  Mon Mar 6 15:56:02 2023, All, , , Calibration with AmBeNi source for PARIS Capture_d’écran_du_2023-03-06_12-25-59.png
Start at 12:23

 

==> DAQ started at : 23-03-06 at 12h-47m-07s    
Entry  Mon Mar 6 16:27:08 2023, Iolanda, pjn, Other, General, PARIS Configuration Layouts_new.pdf
 
Entry  Mon Mar 6 16:28:42 2023, Iolanda, pjn, Other, General, PARIS BIAS Voltages Capture_d’écran_du_2023-03-06_16-16-11.pngCapture_d’écran_du_2023-03-06_16-16-55.pngCapture_d’écran_du_2023-03-06_16-16-25.pngCapture_d’écran_du_2023-03-06_16-15-57.pngCapture_d’écran_du_2023-03-06_16-16-39.png
 
Entry  Mon Mar 6 17:00:29 2023, All, , , Calibration with AmBeNi source for PARIS - part 2 Capture_d’écran_du_2023-03-06_17-00-18.png
Start 16:44

Start a second calibration run after changing the voltage offset of the FR1D5 (label 505) PARIS detector from 0.9 to 0.8.

Didn't recover detector FR1D8. Correlation matrix still look bad.
Entry  Mon Mar 6 18:01:02 2023, pjn, Other, Other, Target changer problem IMG_0435.jpeg
Target changet doesn't place taregts in a correct position.

There is no possibility to put a hole in a target position properly.

The chamber has to be oppened to fix it.
Entry  Mon Mar 6 22:10:30 2023, KWL PJN, Other, General, target holder IMG-20230306-WA0000.jpg
Target holder - positions:

1  hole

2  quartz
Entry  Tue Mar 7 01:16:15 2023, Desi, Michalina, , , No target run 
Beam intensity is 0.3 enA

No target on the beam, test run with wheel position 1

Start 00:40
Entry  Tue Mar 7 01:56:12 2023, Desi, Michalina, , , Run_1 
Run_1

Target position 4 - 208Pb 2 mg/cm^2

START: 01:52
Entry  Tue Mar 7 04:48:22 2023, Desi, Michalina, , , Run 2 Capture_d’écran_du_2023-03-07_04-47-27.pngCapture_d’écran_du_2023-03-07_05-00-00.png
We checked if the target is okay before the start of this run.
On the camera it looked attached and not broken.

However we have trouble interpreting the spectra. Seems like the lines in 40Ca are missing
Entry  Tue Mar 7 08:23:17 2023, pjn, Routine, General, run 4 Capture_d’écran_du_2023-03-07_08-26-41.png
start 8:20

beam cuurent: 0.3 enA

data stream 4.4 MB/s
Entry  Tue Mar 7 09:06:31 2023, pjn, Routine, General, run 5 Capture_d’écran_du_2023-03-07_09-07-37.png
start 9:05

Energy too high for the digitisers

Gain changed from 6 to 5 on MDU-16s
Entry  Tue Mar 7 05:59:17 2023, Desi, Michalina, , , Run 3 
Start 06:00

 

 
    Reply  Tue Mar 7 10:19:37 2023, pjn, , , Run 3 
for runs 1-3 energy was to high

corrected in run 4

 
Entry  Tue Mar 7 15:32:02 2023, KWL PJN, Other, General, improving beam intensity and a note on the DSSD spectra run5_sector2.pngrun4_sector2.pngrun3_sector2.png
Over a night 6/7 of March the beam intensity was very low , i.e. ~ 0.3 enA (compared to the 12 enA indicated in the proposal)  and the beam energy
was higher than requested in the proposal.

We have requested for a higher beam intensity. The operators are trying to improve it now.
Entry  Tue Mar 7 19:24:41 2023, Kasia WL, Kasia HK, PJN, , General, run with the empty frame hole2_test_scalers.png
Hakim et al., played with the beam - they put the C cone and tested it - it worked for C but then it didn't work with Ca.

We decided to take the beam. First run is the test with the empty frame to see the background.

Current - 0.35 enA = 0.03 pnA
Entry  Tue Mar 7 20:15:38 2023, pjn, Routine, General, run_6 Capture_d’écran_du_2023-03-07_20-16-26.png
Start 20:13

Stop 21:03

Beam current 0.25enA
Entry  Tue Mar 7 21:05:10 2023, KWL KHK PJN MKOM, Other, General, run 7 - change target to 197Au run7_197Au_pos6.png
we stopped run 6 with 208Pb target and we change target to the 197Au in order to see the target excitation in gamma ray spectrum.

started at 21:10

beam intensity: 0.45 enA
Entry  Tue Mar 7 22:39:36 2023, Kasia WL, Kasia HK, PJN, Other, , comaprison - Au and Pb targets spectrum_Pb.pngspectrum_Au.png
We decided to change the target to 197Au, 2 mg/cm2 (pos 6) in order to check how the gamma spectra look like.

We obtained a very clean gamma spectrum compared to the one collected with Pb target. We concluded that the Pb target is probably contaminated
and it's also probably the effect of the frame size - Au target is mounted on a frame with a bigger hole than Pb, means that we could have seen also
Entry  Tue Mar 7 23:35:38 2023, PJN MKOM, , , run_8 
==> DAQ started at : 23-03-08 at 00h-01m-07s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 03:30:36 2023, MKOM, , , run_9 
==> DAQ started at : 23-03-08 at 01h-55m-20s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 05:33:15 2023, MKOM, , , run_10 
==> DAQ started at : 23-03-08 at 04h-08m-42s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 07:44:09 2023, MKOM, , , run_11 
==> DAQ started at : 23-03-08 at 05h-59m-45s
==> Shell name      : ./.user_start.sh
    File name       : run
Entry  Wed Mar 8 07:45:21 2023, KHK, MKOM, , , run_12 run_12.png
Stopped because Hakim wants to change the source bottle to Ca - ammoniac

 

 
Entry  Wed Mar 8 18:41:18 2023, KHK, PJN, KWL, , , distance DSSD - target dssd.xlsx
According to PJN: 3 cm, could be 3.5 cm as well
Entry  Wed Mar 8 23:08:50 2023, lolanda, Other, Other, PARIS - pol1 LaBr/CeBr calib Ene_cal_NSI85_PARIS.odsSelection_001.pngSelection_002.pngSelection_002.png
##""Calibration points : 661, 1173, 1332, 4440 keV

Ene_cal_NSI85_PARIS.ods

 
Entry  Thu Mar 9 09:01:32 2023, Michalina, KasiaHK KasiaWL, , , beam is back 
We have a beam back of intensity of 3 enA. The beam is now tunned  through the hole (position 1)
Entry  Thu Mar 9 18:44:20 2023, Kasia WL, Kasia HK, GP, JW, , , beam on a target - run_15 Capture_d’écran_du_2023-03-09_18-02-35.png
The beam is back after the adjustments by Hakim and his team

Beam energy 165 MeV

Intensity 2 enA (on the target)
Entry  Thu Mar 9 18:48:11 2023, Kasia WL, Kasia HK, GP, JW, , , run_16 
Current 0.18 pnA

 

 
Entry  Thu Mar 9 19:21:45 2023, Kasia WL, Kasia HK, , , run_17 run_17.png
TIMER WAS SET by SOMEONE??? to 30 min

we changed it to 120 min

run stopped at 21:19
Entry  Thu Mar 9 21:29:53 2023, Kasia WL, Kasia HK, Routine, , run 19 run_19.png
started at 21:27

beam intensity 0.1 enA. This is consisitent with observed counting rate in DSSD which dropped by a factor of 10

 
Entry  Thu Mar 9 23:12:39 2023, MMM, KHK, , , run_20 Capture_d’écran_du_2023-03-09_23-14-40.png

                                                                                                                                                                                                            
==> DAQ started at : 23-03-09 at 23h-35m-12s                                                   &nb
Entry  Fri Mar 10 01:05:11 2023, MMM, Routine, General, run_21 Capture_d’écran_du_2023-03-10_01-06-19.png


==> DAQ started at : 23-03-10 at 01h-29m-07s                                                                                                                                                                     
Entry  Fri Mar 10 03:04:49 2023, MMM, , , run_22 Capture_d’écran_du_2023-03-10_03-05-40.png
=> DAQ started at : 23-03-10 at 03h-28m-32s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                                
Entry  Fri Mar 10 05:08:04 2023, MMM, , , run_23 Capture_d’écran_du_2023-03-10_05-09-04.png
==> DAQ started at : 23-03-10 at 05h-31m-27s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Fri Mar 10 07:08:59 2023, Waely, Routine, General, stop run 23 
DAQ stopped at 23-03-10 at 07h-31m-27s

shell name : ./.user_stop_trunkv3.sh                                                                                                                                                                         
 
Entry  Fri Mar 10 07:09:55 2023, Waely, Routine, General, start run 24 Capture_d’écran_du_2023-03-10_07-19-10.png
 

DAQ started at : 23-03-10 at 07h-34m-02s     
Shell name      : ./.user_start.sh           
Entry  Fri Mar 10 09:12:13 2023, Waely, Routine, General, stop run 24 and go run 25 Capture_d’écran_du_2023-03-10_09-13-29.png
daq stopped at 23-03-10 at 09h-34m-03s

 

Entry  Fri Mar 10 09:23:29 2023, Waely, Routine, General, leakage currents 
6.2, 3.5 and 2.3 microA
Entry  Fri Mar 10 14:41:45 2023, KHK, , , end of the 40Ca experiment 
The coulex of 40Ca experiment eneded at 11:05 AM due to the break of the ioniser in the source.

All shifts are cancelled.
 
Entry  Fri Mar 10 14:45:33 2023, KHK, GP, , , 152Eu - efficiency calibration Capture_d’écran_du_2023-03-10_14-46-45.png
152Eu source in the target position

06/10/2021

424E+3 Bq
Entry  Fri Mar 10 16:34:47 2023, KHK, GP, , , 60Co - efficiency calibration Capture_d’écran_du_2023-03-10_16-35-02.png
60Co source in the target position

06/08/2021

3917E+1 Bq
Entry  Fri Mar 10 18:08:37 2023, KHK, GP, MMM, , , alpha calibration, setting 40Ca, pos 5 converter Capture_d’écran_du_2023-03-10_18-12-25.png
Pu239+Am241+Cm244

433 alpha flux

24/06/2019
Entry  Sat Mar 11 11:03:03 2023, KHK, MMM, , , alpha+pulser runs for 40Ca Capture_d’écran_du_2023-03-11_11-08-11.pngCapture_d’écran_du_2023-03-11_11-09-22.pngCapture_d’écran_du_2023-03-11_11-09-52.png
We connected pulser to the preamps (one by one)

the following files contain the pulser + tripple alpha:

alpha_DSSD_exp40Ca_set5conv_pulser_s1.fast
Entry  Sat Mar 11 11:14:41 2023, KHK, MMM, , , alpha run for Fe - converter setting 6 Capture_d’écran_du_2023-03-11_16-15-38.png
=> DAQ started at : 23-03-11 at 11h-28m-54s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                                
Entry  Sat Mar 11 17:07:49 2023, Kasia, Magda, Giorgia, , , PARIS and HPGe (4MeV) calibration with AmBeNi source 
Start 17:05

 

==> DAQ started at : 23-03-11 at 17h-30m-09s         
Entry  Wed Feb 14 13:29:32 2024, Kasia i Iwona, Other, Other, do przeniesienia! testy FEB 2024 - detektor Orsay, Ringi 
 
ELOG V3.1.5-fc6679b