EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, all entries  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Jan 23 16:55:21 2024, yes, Other, , , 106Cd certificate Slp823030223120.pdf
 
Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):
Entry  Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png
16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed
Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files
Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 
Entry  Mon Mar 13 12:16:31 2023, MP, Other, , , run 66 
run 66 started, radiocativity (background)

 
Entry  Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line 
At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH
40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement
Entry  Sun Mar 12 22:52:36 2023, Bahadir Saygi, Other, , General, Plunger Run Files  134Sm_cont.zip134Sm.zip
Plunger run files for later to calculate error in the distance
Entry  Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling 
 
Entry  Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration 
started

source in the target position, as precisely as possible

 
Entry  Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted. 
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 
Entry  Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,  
Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.
Entry  Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started. 
18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
Entry  Sun Mar 12 18:50:37 2023, OST, Runs, , General,  
run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s
Entry  Sun Mar 12 17:03:12 2023, OST, Runs, , General,  
run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s
Entry  Sun Mar 12 13:20:00 2023, EG, Problems, , , No Data 
For a split second a red "NO DATA" notification appeared in the top right corner of Counting rates dashboard.

It looks like it did not change anything in data collection.

Entry  Sun Mar 12 09:15:00 2023, EG, Other, , , Array_monitors mat refresh synchronization 
Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....

(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour
is dysplayed. Not very usefull and (I suppose) missleading information.
Entry  Sun Mar 12 08:03:08 2023, OST, Runs, , General,  
run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s
Entry  Sun Mar 12 07:01:31 2023, OST, Runs, , General,  
run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s
Entry  Sun Mar 12 04:20:19 2023, OST, Runs, , General, Run 57 stopped, Run 58 started  
 
Entry  Sun Mar 12 03:23:05 2023, AF, Runs, , General, run_0057 
run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s
Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
Entry  Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware 
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
Entry  Sat Mar 11 23:30:47 2023, AF, Runs, , General, run_0056 
run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s
Entry  Sat Mar 11 22:52:48 2023, BS, Runs, , General, run_0055 
run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s
Entry  Sat Mar 11 22:27:08 2023, BS, Runs, , General, Rates Screenshot_2023-03-11_22-26-22.png
Rates 22:18 367Hz

Rates 22:22 4.78 kHz

And Now
see the figure

 
Entry  Sat Mar 11 21:24:04 2023, OST, Runs, , General,  
run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat

RU = 6.45 MB/s
Entry  Sat Mar 11 19:14:35 2023, BS, Runs, , General, Rates Screenshot_2023-03-11_19-11-45.pngScreenshot_2023-03-11_19-11-24.png
Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat

Beam Dump = 0.7 nA

Run number 55
Entry  Sat Mar 11 18:10:06 2023, OST, Runs, , General,  
run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat

RU = 5.72 MB/s
Entry  Sat Mar 11 18:06:36 2023, OST, Runs, , Beam,  
beam started 18:04.
Entry  Sat Mar 11 17:58:35 2023, OST, Runs, , Beam,  
beam stopped 17:54.
Entry  Sat Mar 11 16:22:06 2023, OST, Runs, , General,  
run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0103.caendat

RU = 8.23 MB/s
Entry  Sat Mar 11 15:16:31 2023, EG, Other, , , Beam intensity reduced again 
Again beam intensity to high. Reduced to 2 kHz on ch4 GE
Entry  Sat Mar 11 14:42:28 2023, EG, Runs, , , Beam instabilities 
Large beam intensity instabilities from 14:10 till 14:40.  Beam intensity reduction requested. CH4 on Total rate EAGLE_0 returned to 1.9kHz. Intensity
became stable.

 
Entry  Sat Mar 11 14:15:55 2023, EG, Runs, , , Beam intensity rapid increase  
14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal after 4 minutes.
Entry  Sat Mar 11 12:42:42 2023, EG, Other, , , Beam intensity reduction 
Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4.  Beam intensity reduction requested. 1.8 kHz on ch4 after reduction.
Entry  Sat Mar 11 11:39:55 2023, EG, Problems, , , Buffers clearing 
at 11:34:50 sek on 11 march a spike in counting rate of some Ge detectors is observed. Buffers not cleared properly?


 
Entry  Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,  
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.

 
Entry  Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters 
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?
Entry  Sat Mar 11 00:34:51 2023, BS, Runs, , General, Run 55 Started New Distance 500 um 
Run 55 Started New Distance 500 um
Entry  Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped 
run 54 - stopped due to change the distance in plunger


Run number: 54
Start time: Fri Mar 10 23:14:54 2023
Stop time: Sat Mar 11 00:02:37 2023
Entry  Fri Mar 10 23:35:28 2023, IP, Runs, , General,  
run control = 54

 

run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat
Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 
the daq resolved at 23:15

start new run: run 54
Entry  Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped 
the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped
Entry  Fri Mar 10 16:14:19 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_16-10-45.png
From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 
    Reply  Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_22-37-27.png
the rates of detectors are still a bit higher




Quote:



From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.
Entry  Fri Mar 10 22:36:55 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat
Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 
the beam is now good focused
Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 
the beam starts at 21:27.

But the operators are still working on focusing the beam.
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 
the beam is not the best focused. The operator works on this problem.
Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 
the beam is stopped at 21:23.
Entry  Fri Mar 10 21:15:01 2023, IP, Runs, , General,  
run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat
Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 
the beam comes back at 20:54
Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 
the beam was lost at 20:46. The operator is working to solve the problem.
Entry  Fri Mar 10 19:42:57 2023, IP, Runs, , General,  
run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0020.caendat
Entry  Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam 
the beam start: 19:31
Entry  Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam  
the beam was stopped at 19:27


 
Entry  Fri Mar 10 18:42:02 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0014.caendat
Entry  Fri Mar 10 17:34:07 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0007.caendat
Entry  Fri Mar 10 16:23:21 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0000.caendat
Entry  Fri Mar 10 16:17:57 2023, IP, Runs, , General, run 52 - stopped 
run 52 - stopped

 


Run number: 52
Start time: Fri Mar 10 01:19:56 2023
Stop time: Fri Mar 10 16:16:25 2023
Entry  Fri Mar 10 15:04:16 2023, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0074.caendat

RU = 7.17 MB/s
Entry  Fri Mar 10 13:35:49 2023, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0064.caendat

RU = 7.06 MB/s
Entry  Fri Mar 10 11:36:23 2023, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0053.caendat

RU = 5.69 MB/s
Entry  Fri Mar 10 10:03:36 2023, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s
Entry  Fri Mar 10 10:02:30 2023, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s
Entry  Fri Mar 10 08:02:39 2023, AM, Problems, , Beam, bigger data rate  
rate of ch4 above 2kHz, too big beam intesivity, highier data rate from: 07:51
 
Entry  Fri Mar 10 07:03:54 2023, AM, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0029.caendat

RU = 6.06 MB/s
Entry  Fri Mar 10 05:40:34 2023, AM, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0022.caendat

RU = 6.59 MB/s
Entry  Fri Mar 10 03:20:42 2023, AM, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0010.caendat

RU =  5.55 MB/s
Entry  Fri Mar 10 01:32:20 2023, AM, Runs, , General, run 51 stopped 
run 51 stopped


Run number: 51
Start time: Thu Mar 9 16:25:00 2023
Stop time: Fri Mar 10 00:13:21 2023


 

 
Entry  Fri Mar 10 01:28:48 2023, AM, Problems, , Other, Plunger distance 
longer break during chane of plunger distance due to technical problem, you can not move plunger to larger distances, so now we are choosing smaller
distance in the morning we ask the specialists
 
Entry  Fri Mar 10 00:09:32 2023, AM, Runs, , General,  
run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0040.caendat

RU =  5.56 MB/s
Entry  Thu Mar 9 22:32:01 2023, IP, Runs, , General,  
run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0032.caendat

RU =  6.12 MB/s
Entry  Thu Mar 9 21:20:06 2023, IP, Runs, , General,  
run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0026.caendat

RU =  6.23MB/s
Entry  Thu Mar 9 19:58:02 2023, IP, Runs, , General,  
run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0018.caendat

RU =  5.93 MB/s
Entry  Thu Mar 9 17:57:41 2023, MW, Runs, , General,  
run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat

RU =  6.45MB/s
Entry  Thu Mar 9 16:54:27 2023, MK, Runs, , General,  
run control = 51

run data =  /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat

RU =  6.43MB/s
Entry  Thu Mar 9 16:25:57 2023, IP, Runs, , General, run 50 stopped 
run 50 - stopped


 
Run number: 50
Start time: Thu Mar 9 00:50:57 2023
Stop time: Thu Mar 9 16:22:37 2023
Entry  Thu Mar 9 15:17:32 2023, OST, Runs, , General,  
run control = 50

run data =  /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0087.caendat

RU =  6.04 MB/s
Entry  Thu Mar 9 13:37:33 2023, OST, Other, , Beam, Beam stopped 13:37-13:49 for control again. 
 
Entry  Thu Mar 9 13:22:37 2023, OST, Other, , Beam, beam stopped 13:21-13:24 for control 
 
Entry  Thu Mar 9 12:06:30 2023, OST, Runs, , General,  
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0070.caendat

RU =  6.89 MB/s
Entry  Thu Mar 9 10:05:30 2023, OST, Runs, , General,  
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0058.caendat

RU =  7.48 MB/s
Entry  Thu Mar 9 08:54:13 2023, OST, Runs, , General,  
run control = 50

run data =/onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0051.caendat

RU =  6.86 MB/s
Entry  Thu Mar 9 07:28:59 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0042.caendat

 
Entry  Thu Mar 9 06:24:10 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat

 
Entry  Thu Mar 9 05:19:33 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat

 
Entry  Thu Mar 9 04:17:21 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0022.caendat

 
Entry  Thu Mar 9 03:14:39 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0015.caendat

 
Entry  Thu Mar 9 02:14:09 2023, WP, Runs, , General, General 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0008.caendat

 
Entry  Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
Entry  Thu Mar 9 01:07:48 2023, WP, Runs, , General, New run started 50 (distance change) 
run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0000.caendat

 
Entry  Wed Mar 8 22:36:30 2023, OST, Runs, , General,  
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0082.caendat

RU =  6.06 MB/s
Entry  Wed Mar 8 20:46:16 2023, OST, Runs, , General,  
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0074.caendat

RU =  6.35 MB/s
Entry  Wed Mar 8 19:01:49 2023, OST, Runs, , General, beam current was very low and beam increased after this entry 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0064.caendat

RU =  5.75 MB/s
Entry  Wed Mar 8 18:02:43 2023, BS, Runs, , General, Rates Screenshot_2023-03-08_18-01-49.png
 
Entry  Wed Mar 8 17:59:38 2023, BS, Runs, , General, General 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat

RU =  9.83 MB/s
Entry  Wed Mar 8 16:53:07 2023, BS, Runs, , General, Rates Screenshot_2023-03-08_16-52-03.pngScreenshot_2023-03-08_16-51-42.png
 
Entry  Wed Mar 8 16:51:13 2023, BS, Runs, , General,  
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat

RU =  6.75 MB/s
Entry  Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue 
no beam in 15:52 - 16:21 due to power supply problem
Entry  Wed Mar 8 14:47:34 2023, AM, Runs, , Beam, beam unstable 
two drops in beam intesitivity at 14:33, 14:37 and 14:51
Entry  Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra Screenshot_2023-03-08_13-03-10.png
Ge spectra after #161 - #162 beam tuning.
Entry  Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
Entry  Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned 
Beam tuning was made, focusing significantly improved.

 

Intensity:
Entry  Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator. 
Asked for improved focusing.

Attached screenshots and Ge spectra from before changing anything.
Entry  Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
Entry  Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra Screenshot_2023-03-08_10-24-20.png
Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 
Entry  Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started 
Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png
The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.
Entry  Wed Mar 8 07:30:15 2023, KS, KSz, Problems, , Beam, beam unstable 
The beam was unstable from 7:18 to 7:25.
Entry  Wed Mar 8 06:25:53 2023, KS, KSz, Runs, , General,  
run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0029.caendat

RU =  6.59 MB/s
Entry  Wed Mar 8 04:24:40 2023, KS, KSz, Runs, , General, Run 48 
run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat

RU =  5.75 MB/s
Entry  Wed Mar 8 02:45:53 2023, KS, KSz, Other, , Beam, increase in Counting Rates  
Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz ch4.

run control = 48
Entry  Wed Mar 8 01:24:58 2023, KS, KSz, Runs, , General, New run started 48 (new distance) 
run control = 48

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat

RU =  5.09 MB/s
Entry  Wed Mar 8 01:24:04 2023, BS, Runs, , General, Run 47 Stopped to Change Distance Change 
Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495
Entry  Wed Mar 8 00:31:05 2023, KS, KSz, Runs, , General, Run 47 standard info 
run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s
Entry  Tue Mar 7 23:54:05 2023, IP, KS, Runs, , General,  
run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0000.caendat

RU =  4.47 MB/s
Entry  Tue Mar 7 23:39:52 2023, IP, KS, Runs, , General, run 46 stopped 
Run 46 - stopped


Run number: 46
Start time: Tue Mar 7 15:09:06 2023
Stop time: Tue Mar 7 23:38:07 2023
Entry  Tue Mar 7 21:55:45 2023, IP, Runs, , General,  
run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0034.caendat

RU =  4.78 MB/s
Entry  Tue Mar 7 20:45:13 2023, IP, Runs, , General,  
run control = 46

run data =/onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0028.caendat

RU =  4.9 MB/s
Entry  Tue Mar 7 20:42:03 2023, IP, Problems, , Beam, beam unstable 
There was a problem with the beam from 20:19 to 20:30.

Now it is fine.
Entry  Tue Mar 7 19:24:25 2023, IP, Runs, , General,  
run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0022.caendat

RU =  6.22 MB/s
Entry  Tue Mar 7 17:45:18 2023, IP, Runs, , General,  
run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0013.caendat

RU =  6.10 MB/s
Entry  Tue Mar 7 16:06:16 2023, OST, Runs, , General,  
run control = 46

run data =/onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0004.caendat

RU =  6.51 MB/s
Entry  Tue Mar 7 15:14:29 2023, OST, Problem Fixed, , Software, Run 46 started-15_Ge and number 5 anticompton working now. 
VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 
Entry  Tue Mar 7 15:12:06 2023, OST, Problems, , Software, run 45 stopped 
14:30 pm to 15:00 run 45 crashed and stopped
Entry  Tue Mar 7 14:39:08 2023, BS, Other, , General, Runlist File ScreenShot Accesses on 07 MArch at 14:38 Screenshot_2023-03-07_14-37-51.png
 
Entry  Tue Mar 7 14:23:43 2023, BS, Other, , General, RU and BU Rates Screenshot_2023-03-07_14-22-35.png
 
Entry  Tue Mar 7 14:07:33 2023, BS, Other, , General, Run Files Number 
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf
Entry  Tue Mar 7 14:03:20 2023, BS, Runs, , General, Counting Rates Screenshot_2023-03-07_14-01-56.png
 

 
Entry  Tue Mar 7 13:51:17 2023, OST, Runs, , General,  
run control = 45

not fixed number 15_Ge dedector and number 5 anticompton.

run data =/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0025.caendat
Entry  Tue Mar 7 12:50:52 2023, OST, Runs, , General,  
run control = 45

not fixed number 15_Ge dedector and number 5 anticompton.

run data =/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0019.caendat
Entry  Tue Mar 7 11:19:54 2023, OST, Runs, , General,  
run control = 45

not fixed number 15_Ge dedector and number 5 anticompton.

run data =/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0011.caendat
Entry  Tue Mar 7 09:56:07 2023, OST, Problems, , mechanics, Beam stopped and operators controlling number 15_Ge dedector. 
 
Entry  Tue Mar 7 09:41:44 2023, OST, Problems, , Software, number_Ge_15 dedector not taking data 
after run 45 I reset all spectrums and number_Ge_15 dedector not taking data.

i check the fans_monitor_scaler (EAGLE_array_monitor) monitor and number 15 Ge, number ACS 5 never change the color just staying
white there is a problem.
Entry  Tue Mar 7 09:24:53 2023, OST, Runs, , General,  
run control = 45

run data =/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0000.caendat

RU =  6.92 MB/s
Entry  Tue Mar 7 09:20:53 2023, OST, Problem Fixed, , Beam, run 45 start-local filter turn green 
I started run 45, and local filter turn green everything is ok.
Entry  Tue Mar 7 09:18:01 2023, OST, Problems, , Beam, run number 44 crashed and local filter turned red-but data saved  run_control_7mar2023_0910.png
9:08 local filter turned red. Both .caendat and   LF .adf files still incrementing. Stopped run 44, started run 45, looks OK.

 

 
Entry  Tue Mar 7 07:21:04 2023, JD, DW, Runs, , General,  
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0023.caendat

RU =  6.57 MB/s
Entry  Tue Mar 7 06:18:46 2023, JD, DW, Runs, , General,  
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0017.caendat

RU =6.95    MB/s
Entry  Tue Mar 7 05:19:55 2023, JD, DW, Runs, , General,  
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0011.caendat

RU =   6.48 MB/s
Entry  Tue Mar 7 04:16:28 2023, JD, DW, Runs, , General,  
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0005.caendat

RU =  6.49 MB/s
Entry  Tue Mar 7 03:26:54 2023, JD, DW, Runs, , General, Run 44 started 
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0000.caendat

RU =  6.46 MB/s
Entry  Tue Mar 7 03:21:33 2023, JD, DW, Problem Fixed, , General, daq crash 
daq crashed at 02:59:00, resolved at 03:16:00
 
Entry  Tue Mar 7 02:02:18 2023, JD, DW, Runs, , General,  
run control = 43

run data = /onlineNEDA_00/xData/hil099/run_0043_07-03-2023_00h50m41s/needleRU_i43_0043_0006.caendat

RU = 6.27 MB/s
Entry  Tue Mar 7 00:54:40 2023, JD, DW, Runs, , General, New run started 43 
run control = 43

run data = /onlineNEDA_00/xData/hil099/run_0043_07-03-2023_00h50m41s/needleRU_i43_0043_0000.caendat

RU =  7.13 MB/s
Entry  Tue Mar 7 00:10:02 2023, JD, DW, Runs, , General,  
RUN CONTROL = 42

Data = /onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0075.caendat

RU =   6.86 MB/s
Entry  Mon Mar 6 22:30:46 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat

RU = 6.64 MB/s
Entry  Mon Mar 6 20:29:45 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat

RU = 6.75 MB/s
Entry  Mon Mar 6 19:08:51 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat

RU = 6.95 MB/s
Entry  Mon Mar 6 17:27:42 2023, OST, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0035.caendat

RU =   5.43 MB/s
Entry  Mon Mar 6 17:19:24 2023, OST, Problems, , Beam, beam unstable and a little high 
16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s

17:10 beam fixed. stable
Entry  Mon Mar 6 15:48:23 2023, OST, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0026.caendat

RU =   5.24 MB/s
Entry  Mon Mar 6 14:01:48 2023, OST, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0019.caendat

RU =   5.12 MB/s
Entry  Mon Mar 6 12:10:49 2023, OST, Runs, , General,  
RUN CONTROL = 42

Data = /onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0010.caendat

RU =   5.46 MB/s
Entry  Mon Mar 6 10:56:46 2023, OST, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0004.caendat

 
Entry  Mon Mar 6 10:02:47 2023, OST, Problem Fixed, , General, New run started 42 
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0000.caendat

           /onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleLF_i41_0042_0000.adf
Entry  Mon Mar 6 09:53:06 2023, OST, Problems, , Beam, Beam dump decreased 2.5 nA to 1.5 nA- stopped run 41 
9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA
Entry  Mon Mar 6 09:19:41 2023, OST, Runs, , General,  
RUN CONTROL = 41

Data =/onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0050.caendat

RU =   8.13 MB/s
Entry  Mon Mar 6 08:10:32 2023, JD, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0043.caendat

RU =   7.3 MB/s
Entry  Mon Mar 6 07:19:01 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0038.caendat

RU =  6.46 MB/s
Entry  Mon Mar 6 06:11:51 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0031.caendat

RU =    7.58 MB/s
Entry  Mon Mar 6 05:21:16 2023, JD DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0026.caendat

RU =    8.24 MB/s
Entry  Mon Mar 6 05:16:46 2023, JD, DW, Problem Fixed, , Beam,  
Beam back on 05:15
Entry  Mon Mar 6 05:15:43 2023, JD, DW, Problems, , Beam, No beam 05:10:00 
No beam 05:10:00
Entry  Mon Mar 6 04:17:48 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0020.caendat

RU =    7.26 MB/s
Entry  Mon Mar 6 03:17:48 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0014.caendat

RU =   6.94 MB/s
Entry  Mon Mar 6 02:13:32 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0007.caendat

RU =  7.55 MB/s
Entry  Mon Mar 6 01:10:59 2023, JD, DW, Runs, , General,  
RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0000.caendat

RU = 6.23 MB/s
Entry  Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started 
Run 41 started

Plunger distance 10 um
Entry  Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped 
Run 40 stooped
Entry  Mon Mar 6 00:43:27 2023, BS, GJ, Runs, , General, Run 40 Started LocalFilter.conf
Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 
Entry  Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted 
New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
Entry  Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)
Entry  Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk 
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed
Entry  Sun Mar 5 15:07:24 2023, mgb, Runs, , General, Beam dump decreased 1.0 nA to 0.75 
RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s
Entry  Sun Mar 5 13:52:34 2023, OST, Runs, , General,  
RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0097.caendat

RU = 8.17
Entry  Sun Mar 5 11:45:36 2023, OST, Runs, , General,  
RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0082.caendat

RU = 8.50
Entry  Sun Mar 5 10:17:03 2023, OST, Runs, , General,  
RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0072.caendat

RU = 8.01
Entry  Sun Mar 5 08:54:08 2023, OST, Runs, , General,  
RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0061.caendat

RU = 8.12
Entry  Sun Mar 5 07:12:49 2023, JD DW, Runs, , General,  
RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0051.caendat

RU =   8.02 MB/s
Entry  Sun Mar 5 06:03:26 2023, JD DW, Runs, , General,  
UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0043.caendat

RU =  7.65 MB/s
Entry  Sun Mar 5 05:06:50 2023, JD DW, Runs, , General,  
RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0037.caendat

RU =  7.93 MB/s
Entry  Sun Mar 5 04:04:39 2023, JD DW, Runs, , General,  
UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0030.caendat

RU =  7.78 MB/s
Entry  Sun Mar 5 03:11:45 2023, JD DW, Runs, , General,  
RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0023.caendat

RU =   7.62 MB/s
Entry  Sun Mar 5 02:06:40 2023, JD DW, Runs, , General,  
UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0017.caendat

RU =  7.86 MB/s
Entry  Sun Mar 5 01:26:58 2023, JD DW, Runs, , General,  
UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0010.caendat

RU =  6.96 MB/s
Entry  Sun Mar 5 00:08:06 2023, AF, Runs, , General,  
AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0005.caendat
Entry  Sat Mar 4 23:28:16 2023, AF, Runs, , General,  
AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0000.caendat
Entry  Sat Mar 4 20:56:40 2023, AF, Runs, , General,  
AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat
Entry  Sat Mar 4 19:14:30 2023, AF, Runs, , General,  
AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0144.caendat
Entry  Sat Mar 4 18:02:48 2023, mgb, Runs, , General,  
UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat

RU = 6.39 MB/s
Entry  Sat Mar 4 17:09:13 2023, mgb, Runs, , General,  
RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat

RU = 6.45 MB/s
Entry  Sat Mar 4 16:06:19 2023, mgb, Runs, , General,  
RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat

RU = 6.25
Entry  Sat Mar 4 15:02:54 2023, mgb, Runs, , General, running stable 
RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99
Entry  Sat Mar 4 13:43:20 2023, OST, Runs, , General,  
RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30
Entry  Sat Mar 4 12:34:52 2023, OST, Runs, , General,  
RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17
Entry  Sat Mar 4 11:06:31 2023, OST, Runs, , General,  
RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03
Entry  Sat Mar 4 09:51:32 2023, OST, Runs, , General,  
RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43
Entry  Sat Mar 4 08:27:23 2023, OST, Runs, , General,  
RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57
Entry  Fri Mar 3 23:38:28 2023, SP, Runs, , General, How different Ge count ge_en_cal_230303_2337.png
All germanium detecors look reasonable, as attached.
Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 
Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg
Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached
Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 
Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire
was tightened, which seemingly resolved the issue (stability of beamdump readout).   
Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 
Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
Entry  Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped  
Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.
Entry  Fri Mar 3 14:22:12 2023, IP, Runs, , General,  
the beam comes back. The run 35 is still going.

 

plunger run # 257
Entry  Fri Mar 3 13:54:41 2023, IP. KWL, Runs, , General, beam energy measurement 
beam stop due to the beam energy measurement

The beam energy: ~145 MeV
Entry  Fri Mar 3 13:43:56 2023, IP. KWL, Runs, , , 511 annihilation and 279 Au lines in Ge rings ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png
The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible
for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101
Entry  Fri Mar 3 12:11:24 2023, IP, Runs, , General,  
the beam comes back.
Entry  Fri Mar 3 11:48:29 2023, IP, Runs, , General, beam stopped 
The beam is gone.
Entry  Fri Mar 3 11:37:25 2023, IP, Runs, , General,  
plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA
Entry  Fri Mar 3 10:21:18 2023, IP. KWL, Runs, , General, beam intensity back to 1.25 enA at the beam dump 
we increased beam intensity to 1.25 enA (readout at the beam dump)
Entry  Fri Mar 3 10:09:20 2023, IP. KWL, Runs, , General, beam intensity decreased to 0.3 enA (at beam dump) on our request  Ge_beamInten_03enA_differentYscale.pngGe_beamInten_03enA_sameYscale.png
// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced
for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)
Entry  Fri Mar 3 09:30:15 2023, IP. KWL, Runs, , General,  
plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA
Entry  Fri Mar 3 08:20:13 2023, KWL, Runs, , General,  
plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA
Entry  Fri Mar 3 07:32:28 2023, OST, Runs, , General,  
plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA
Entry  Fri Mar 3 06:24:03 2023, OST, Runs, , General,  
plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA
Entry  Fri Mar 3 05:18:35 2023, OST, Runs, , General,  
plunger run # 167

 

Beam dump 2.5 enA
Entry  Fri Mar 3 04:15:32 2023, mgb, Runs, , General,  
plunger run # 157

 

Beam dump 2.5 enA
Entry  Fri Mar 3 03:19:34 2023, mgb, Runs, , General,  
plunger run # 147

 

Beam dump 2.5 enA
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Fri Mar 3 02:20:46 2023, mgb, Runs, , General,  
plunger run # 137

 

Beam dump 2.5 enA
Entry  Fri Mar 3 01:15:27 2023, mgb, Runs, , General,  
 

plunger run # 126

Earlier:   CUP#6  100 enA
Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 
Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
Entry  Thu Mar 2 23:01:21 2023, A.T., Runs, , General, Run 34 started 
Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um
Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 
Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um
Entry  Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped 
Run 32 Stopped
Entry  Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations 
Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um
Entry  Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum. 
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues 
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 14:59:32 2023, mgb, Runs, , General,  
 

 

Data
Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 
EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.
Entry  Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,  
beam stop,
Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 
We hane now g-g trigger started.

Run 30 started
Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 
We will change the trigger and we stopped the run number 29
Entry  Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,  
un 29 with single gamma trigger

Plunger feedback system is not connected.

Data
Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 
Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data
Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 
run 28 started
Entry  Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,  
Run 27 stopped
Entry  Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates 
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Thu Mar 2 09:05:43 2023, DOD, Problems, , , Sulphur on aluminium fusion-evaporation reactions 
Using  the data which we've sorted to date, I looked into the gamma-gamma coincidences and have identified a number of nuclei e.g. 50Cr, 52Mn,
55Fe which would be consistent with fusion-evaporation reactions involving the sulphur-32 projectiles and aluminium-27. Such reactions would yield a 59Cu
comound system and these channels would be populated as a result of the evaporation of a combination of alphas, protons and neutrons.
Entry  Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,  
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,  
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Thu Mar 2 04:17:40 2023, DOD, Runs, , General,  
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,  
Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data
Entry  Wed Mar 1 21:59:45 2023, MB BS, Other, , General,  
Offset of the plunger is 60 um.

new distcal01_vac_after_opening
Entry  Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,  
Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.
Entry  Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started 
Run 26 Started

 

Beam 9 enA on the collimator
Entry  Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started 
Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.
Entry  Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped 
Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.
Entry  Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target 
Beam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)    not stable
Entry  Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam 
Operators tune beam on the target, collecting run 0023, trigger gg.
Entry  Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy 
Beam energy measured:  148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV)
Entry  Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger 
Plunger Run :

Micrometer :

Supposed Distance:
Entry  Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST 
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23
Entry  Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs 
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
Entry  Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations 
Off set of the plunger ~60 um

Distcal file   distcal01_vac

 
Entry  Mon Feb 27 12:10:24 2023, BS, Other, , Target, target 
Support of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Entry  Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants 
To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
ELOG V3.1.5-fc6679b